May 24, 2005
Michael Freedman and Tim Ransdell
California Institute for Federal
Policy Research, 419 New Jersey Avenue SE, Washington, DC 20003
Phone: 202-546-3700 Fax: 202-546-2390 [email protected] http://www.calinst.org
This report is available on the web at http://www.calinst.org/defense/bdetailB.htm
. A pdf version is available at http://www.calinst.org/defense/bdetailB.pdf
. A variety of other California-related
realignment and base closure information is available at http://www.calinst.org/defense.htm
.
The following is a compilation of the Department of
Defense’s detailed Base Realignment and Closure (BRAC) recommendations that
refer to California installations.
These excerpts contain each of the Pentagon’s recommendations in its
entirety, including information about bases outside of California. The additional information is included to
provide some context for the recommendations that affect California bases. To find information for a particular base
affected by the BRAC recommendations, use the index on the following page. The text of the recommendations has been
copied in the order it appears in the Pentagon’s “Detailed Recommendations”
which can be accessed in PDF form on the Department of Defense’s BRAC website
at http://www.defenselink.mil/brac/vol_I_parts_1_and_2.html
.
Base Closure and Realignment
Detailed Recommendations for California Bases
RC Transformation in California
USAR Command and Control – Southwest
Recommendation for Closure Engineering Field Division/Activity
Recommendation for Closure Navy and Marine Corps Reserve Centers
Reno-Tahoe International Airport Air Guard Station, NV
Education and Training Joint Cross
Service Group
Joint Strike Fighter Initial Joint Training Site
Headquarters and Support Activities
Joint Cross-Service Group
Consolidate Correctional Facilities into Joint Regional Correctional
Facilities
Industrial Joint Cross-Service
Group
Medical Joint Cross-Service Group
San Antonio Regional Medical Center, TX
Supply and Storage Joint
Cross-Service Group
Commodity Management Privatization
Supply, Storage, and Distribution Management Reconfiguration
Technical Joint Cross-Service Group
Consolidate Air and Space C4ISR Research, Development &
Acquisition, Test & Evaluation
Consolidate Maritime C4ISR Research, Development & Acquisition,
Test & Evaluation
Create an Integrated Weapons & Armaments Specialty Site for Guns
and Ammunition
List of Affected Bases
NOTE: THE PDF
VERSION OF THIS DOCUMENT INCLUDES AN INDEX WITH CROSSREFERENCED PAGE NUMBERING
Armed Forces Reserve Center
Bell
Beale Air Force Base
Camp Parks (91st)
Channel Islands Air Guard
Station
Defense Dinance and
Accounting Service, San Bernardino
Defense Distribution Depot
San Joaquin
Defense Distribution Depot
San Joaquin,
Defense Finance and
Accounting Service, Oakland
Defense Finance and
Accounting Service, San Diego
Defense Finance and
Accounting Service, Seaside
Edwards Air Force Base
Fort Hunter Liggett
Fresno Air Guard Station
Human Resource Service
Center-Southwest
Los Alamitos (63rd)
March Air Reserve Base
Marine Corps Air Station Miramar
Marine Corps Base Camp
Pendleton
Marine Corps Base Miramar
Marine Corps Logistics Base
Barstow
Marine COrps Logistics Base
Barstow
Marine Corps Reserve Center
Pasadena
Moffett Field
Naval Air Station Lemoore
Naval Air Weapons Station
China Lake
Naval Base Coronado
Naval Base Point Loma
Naval Base Ventura
Naval Medical Center San
Diego
Naval Station San Diego
Naval Support Activity
Corona
Naval Weapons Station
Fallbrook
Naval Weapons Station Seal
Beach
Navy Marine Corps Reserve
Center Encino
Navy Marine Corps Reserve
Center Los Angeles
Onizuka Air Force Station
Riverbank Army Ammunition
Plant
Recommendation:
Close the
United States Army Reserve Center, Moffett Field, California, the George Richey United States Army Reserve Center, San
Jose, California, and the Jones Hall United States Army Reserve Center,
Mountain View, California and relocate units to a new Armed Forces Reserve
Center with an Organizational Maintenance Shop on existing Army Reserve
property on Moffett Field, California. The new AFRC shall have the capability
to accommodate California National Guard Units from the following California
ARNG Readiness Centers: Sunnyvale, California, San Lorenzo, California, Redwood
City, California, and the Organizational Maintenance Shop, San Jose,
California, if the state decides to relocate those National Guard units.
Close
the Desiderio United States Army Reserve Center, Pasadena, California, the
Schroeder Hall United States Army Reserve Center, Long Beach, California, the
Hazard Park United States Army Reserve Center, Los Angeles, California, and
relocate units to a new Armed Forces Reserve Center on property being
transferred to the Army Reserve from the General Services Administration at
Bell, California. The new AFRC shall have the capability to accommodate
California National Guard Units from the following California ARNG Readiness
Centers: Bell, California, and Montebello, California, if the state decides to
relocate those National Guard units.
Justification:
This
recommendation transforms Reserve Component facilities throughout the State of
California. The implementation of this recommendation will enhance military
value, improve homeland defense capability, greatly improve training and
deployment capability, create significant efficiencies and cost savings, and is
consistent with the Army’s force structure plans and Army transformational
objectives.
This
recommendation is the result of a state-wide analysis of Reserve Component
installations and facilities conducted by a team of functional experts from
Headquarters, Department of the Army, the Office of the State Adjutant General,
and the Army Reserve Regional Readiness Command.
This
recommendation closes six Army Reserve centers, two Naval Reserve Centers, and
one Marine Corps Reserve Center, throughout the State of California, and
constructs two multi component, multi functional Armed Forces Reserve Centers
(AFRCs), capable of accommodating National Guard and Reserve units. This
recommendation reduces military manpower and associated costs for maintaining
existing facilities by collapsing fifteen geographically separated facilities
into two modern Armed Forces Reserve Centers. These joint use facilities will
significantly reduce operating costs and create improved business processes.
The Department understands that the State of California will close five California
Army Guard Armories: Sunnyvale, San Lorenzo, Redwood City, Bell, and
Montebello, California, and the Organizational Maintenance Shop, San Jose,
California. The Armed Forces Reserve Centers will have the capability to
accommodate these units if the State decides to relocate the units from these
closed facilities into the new AFRCs.
The
implementation of this recommendation and creation of these new AFRCs will
enhance military value, improve homeland defense capability, greatly improve
training and deployment capability, create significant efficiencies and cost
savings, and is consistent with the Army’s force structure plans and Army
transformational objectives.
This
recommendation considered feasible locations within the demographic and
geographic areas of the closing facilities and affected units. The sites
selected were determined as the best locations because they optimize the
Reserve Components ability to recruit and retain Reserve Component soldiers and
to train and mobilize units impacted by this recommendation. This
recommendation provides the opportunity for other Local, State, or Federal
organizations to partner with the Reserve Components to enhance Homeland
Security and Homeland Defense at a reduced cost to those agencies.
Although
not captured in the COBRA analysis, this recommendation avoids an estimated
$6.3M in mission facility renovation costs and procurement avoidances
associated with meeting AT/FP construction standards and altering existing
facilities to meet unit training and communications requirements. Consideration
of these avoided costs would reduce costs and increase the net savings to the
Department of Defense in the 6-year BRAC implementation period, and in the 20-
year period used to calculate NPV.
Payback:
The total
estimated one-time cost to the Department of Defense to implement this
recommendation is $78.7M. The net of all costs and savings to the Department of
Defense during the implementation period is a cost of $41.3M. Annual recurring
savings to the Department after implementation are $8.9M with a payback
expected in 10 years. The net present value of the costs and savings to the
Department over 20 years is a savings of $46.0M.
Economic
Impact on Communities: Assuming no economic recovery, this recommendation could result in a
maximum potential reduction of 4 jobs (3 direct and 1 indirect jobs) over the
2006 – 2011 period in the San Jose-Sunnyvale-Santa Clara Metropolitan
Statistical Area, which is less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 106 jobs (72 direct and 34 indirect jobs) over the 2006 – 2011
period in the Los Angles-Long Beach-Glendale Metropolitan Statistical Area,
which is less than 0.1 percent of economic area employment.
The
aggregate economic impact of all recommended actions on these economic regions
of influence was considered and is at Appendix B of Volume I.
Community
Infrastructure Assessment: A review of the community attributes revealed no significant issues
regarding the ability of the infrastructure of the communities to support
missions, forces, and personnel. There are no known community infrastructure
impediments to implementation of all recommendations affecting the
installations in this recommendation.
Environmental
Impact: This
recommendation has no impact on air quality, cultural, archeological, or tribal
resources; dredging; land use constraints or sensitive resource areas; marine
mammals, resources, or sanctuaries; noise; threatened and endangered species or
critical habitat; waste management; water resources; or wetlands. This
recommendation will require spending approximately $0.3M for waste management
and/or environmental compliance activities. These costs were included in the
payback calculation. This recommendation does not otherwise impact the costs of
environmental restoration, waste management, and environmental compliance
activities. Installation has no jurisdictional wetlands. The aggregate
environmental impact of all recommended BRAC actions affecting the
installations in this recommendation has been reviewed. There are no known
environmental impediments to implementation of this recommendation.
Recommendation:
Realign the
Joint Force Training Base Los Alamitos, CA by disestablishing the 63rd Regional Readiness Command (RRC) Headquarters, Robinson Hall, USARC and
activating a Southwest Regional Readiness Command headquarters at Moffett Field, CA in a new AFRC. Realign Camp Pike Reserve Complex, Little Rock, AR
by disestablishing the 90th RRC and activating a Sustainment Brigade. Close the
Major General Harry Twaddle United States Armed Forces Reserve Center, Oklahoma
City, OK, and relocate the 95th DIV (IT) to Fort Sill, OK. Realign Camp Parks Reserve Forces Training Area,
CA, by relocating the 91st Div (TSD) to Fort Hunter Liggett, CA.
Justification:
This
recommendation transforms Reserve Component facilities and command and control
structure throughout the Southeast Region of the United States. The
implementation of this recommendation will enhance military value, improve
homeland defense capability, greatly improve training and deployment
capability, create significant efficiencies and cost savings, and is consistent
with the Army’s force structure plans and Army transformational objectives.
This
recommendation is the result of a nation-wide analysis of Reserve Component
installations and facilities conducted by a team of functional experts from
Headquarters, Department of the Army, the Office of the State Adjutant General,
and the Army Reserve Regional Readiness Command.
This
recommendation supports the Army Reserve’s Command and Control restructuring
initiative to reduce Regional Readiness Commands from ten to four. This
recommendation transforms Army Reserve command and control by eliminating
nondeployable command and control headquarters, transforming excess spaces into
deployable units and moving institutional training units onto major training
areas. It supports the Army Reserve’s Command and Control restructuring
initiative to reduce Regional Readiness Commands from ten to four by
disestablishing two major peacetime administrative headquarters, the 63d
Regional Readiness Command in Los Angeles, CA and the 90th Regional Readiness
Command in Little Rock, AR and creating a new consolidated headquarters in
their place at Moffett Field, CA. It supports the transformation of Army Reserve Operational Force
Structure by activating a sustainment brigade in little Rock, AR in the place
of the 90th RRC, which will increase the deployable capability of the Army
Reserve to support the Active Army. The Sustainment brigade is a new
operational capability for the Army Reserve. This proposal transforms the
Army’s training support to the Reserve Component by re-locating the 95th DIV
(Institutional Training) from the Major General Harry Twaddle United States
Army Reserve Center, Oklahoma City, OK to Fort Sill, OK, and relocating the
91st Div (Training Support) from Camp Parks Reserve Forces Training Area,
CA, to Fort Hunter Liggett, CA which improves operational effectiveness by putting these Training
Divisions at major training sites in their regions.
This
recommendation considered feasible locations within the demographic and
geographic areas of the closing facilities and affected units. The sites
selected were determined as the best locations because they optimize the
Reserve Components ability to recruit and retain Reserve Component soldiers and
to train and mobilize units impacted by this recommendation.
Although
not captured in the COBRA analysis, this recommendation avoids an estimated
$16.8M in mission facility renovation costs and procurement avoidances
associated with meeting AT/FP construction standards and altering existing
facilities to meet unit training and communications requirements. Consideration
of these avoided costs would reduce costs and increase the net savings to the
Department of Defense in the 6-year BRAC implementation period, and in the
20-year period used to calculate NPV.
This
recommendation provides the opportunity for other Local, State, or Federal
organizations to partner with the Reserve Components to enhance Homeland
Security and Homeland Defense at a reduced cost to those agencies.
Payback:
The total
estimated one-time cost to the Department of Defense to implement this
recommendation is $55.5M. The net of all costs and savings to the Department of
Defense during the implementation period is a cost of $44.1M. Annual recurring
savings to the Department after implementation are $3.4M with a payback
expected in 23 years. The net present value of the costs and savings to the
Department over 20 years is a savings of $9.8M.
Economic
Impact on Communities: Assuming no economic recovery, this recommendation could result in a
maximum potential reduction of 270 jobs (170 direct and 100 indirect jobs) over
the 2006 – 2011 period in the Santa Ana-Anaheim-Irvine, CA Metropolitan
Division, which is less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 335 jobs (177 direct and 158 indirect jobs) over the 2006 –
2011period in the Little Rock-North Little Rock, AR Metropolitan Statistical
Area, which is less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 69 jobs (43 direct and 26 indirect jobs) over the 2006 – 2011
period in the Oakland- Fremont-Hayward Metropolitan Statistical Area, which is
less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 109 jobs (53 direct and 56 indirect jobs) over the 2006 – 2011
period in the Oklahoma City, OK Metropolitan Statistical Area, which is less
than 0.1 percent of economic area employment.
The
aggregate economic impact of all recommended actions on these economic regions
of influence was considered and is at Appendix B of Volume I.
Community
Infrastructure Assessment: A review of the community attributes revealed no significant issues
regarding the ability of the infrastructure of the communities to support
missions, forces, and personnel. There are no known community infrastructure
impediments to implementation of all recommendations affecting the
installations in this recommendation.
Environmental
Impact: Numerous
archeological and historic resources, coupled with regional tribal interest,
existing restrictions and a lack of a Programmatic Agreement, may result in
increased time delays and negotiated restrictions at Fort Sill. Significant
mitigation measures to limit releases may be required at Fort Sill to reduce
impacts to water quality. Fort Hunter Liggett is over or in the recharge zone
of a sole source aquifer, which may result in future regulatory limitations on
training activities. This recommendation has no impact on air quality,
dredging; land use constraints or sensitive resource areas; marine mammals,
resources, or sanctuaries; noise; threatened and endangered species or critical
habitat; waste management; or wetlands. This recommendation will require
spending approximately $0.02M for waste management and/or environmental
compliance activities. These costs were included in the payback calculation.
This recommendation does not otherwise impact the costs of environmental
restoration, waste management, and environmental compliance activities. The
aggregate environmental impact of all recommended BRAC actions affecting the
installations in this recommendation has been reviewed. There are no known
environmental impediments to implementation of this recommendation.
Recommendation for
Realignment Marine Corps Logistics Base, Barstow, CA
Recommendation: Realign Marine Corps
Logistics Base Barstow, CA. Disestablish the depot maintenance of Aircraft Other Components,
Aircraft Rotary, and Strategic Missiles. Consolidate depot maintenance of
Engines/Transmissions, Other Components, and Small Arms/Personal Weapons at
Anniston Army Depot, AL. Consolidate the depot maintenance of Conventional
Weapons, Engines/Transmissions, Material Handling, Powertrain Components,
Starters/ Alternators/Generators, Test Measurement Diagnostic Equipment, and
Wire at Marine Corps Logistics Base Albany, GA. Consolidate depot maintenance
of Electronic Components (Non- Airborne), Electro-Optics/Night
Vision/Forward-Looking-Infrared, Generators, Ground Support Equipment, Radar,
and Radio at Tobyhanna Army Depot, PA. Consolidate depot maintenance of
Tactical Missiles at Letterkenny Army Depot, PA. Realign Fleet Support Division
Maintenance Center Barstow and Marine Corps Logistics Base Barstow operations
to increase efficiencies and reduce infrastructure.
Justification: This recommendation follows
the strategy of minimizing sites using maximum capacity of 1.5 shifts while
maintaining a west coast depot maintenance presence at Marine Corps Logistics
Base Barstow to provide west coast operating
forces with a close, responsive source for depot maintenance support. Required
capacity to support workloads and core requirements for the DoD is relocated to
other DoD Centers of Industrial and Technical Excellence, thereby increasing
the military value of depot maintenance performed at these sites. This
recommendation decreases the cost of depot maintenance operations across DoD
through consolidation and elimination of 30 percent of duplicate overhead
structures required to operate multiple depot maintenance activities. This
recommendation supports transformation of DoD’s depot maintenance operations by
increasing the utilization of existing capacity by up to 150 percent while
maintaining capability to support future force structure. This recommendation
also results in utilization of DoD capacity to facilitate performance of
interservice workload. In addition, based on present and future wartime surge
projections, Marine Corps Logistics Center Barstow will establish an additional
428 thousand hours of amphibious vehicle capacity.
This recommendation along
with other recommendations affecting supply and storage functions, optimizes
the depot maintenance operations at Marine Corps Logistics Base Barstow.
Payback: The total estimated one-time
cost to the Department of Defense to implement this recommendation is $26.0M.
The net of all costs and savings during the implementation period is a savings
of $56.5M. Annual recurring savings to the Department after implementation are
$18.4M with an immediate payback. The net present value of the costs and
savings to the Department over 20 years is a savings of $230.6M.
Economic Impact on
Communities: Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 796 jobs (409 direct jobs and 387 indirect jobs) over the
2006-2011 period in the Riverside-San Bernardino-Ontario, CA Metropolitan
Statistical Area, which is less than 0.1 percent of economic area employment.
The aggregate economic impact of all recommended actions on this economic
region of influence was considered and is at Appendix B of Volume I.
Community Infrastructure Assessment:
A review of
community attributes indicates no issues regarding the ability of the
infrastructure of the communities to support missions, forces, and personnel.
There are no known community infrastructure impediments to implementation of
all recommendations affecting the installations in this recommendation.
Environmental Impact: Marine Corps Logistics Base
Albany, GA, is in Attainment although Title V permit modifications will be
required. There are potential impacts to cultural, archeological, or tribal
resources; threatened and endangered species or critical habitat; waste
management; and wetlands. Anniston Army Depot, AL, is in Attainment. There are
impacts anticipated for threatened and endangered species or critical habitat.
Letterkenny Army Depot, PA is in Marginal Non-attainment for Ozone (1-Hour and
8-Hour) and an Air Conformity determination is required. Tobyhanna Army Depot,
PA, is in Moderate Non-attainment for Ozone (1-Hour) and an Air Conformity
determination is required. No impacts are anticipated for the remaining
resource areas of dredging; land use constraints or sensitive resource areas;
marine mammals, resources or sanctuaries; noise; or water resources. This
recommendation indicates impacts of costs at the installations, which report
$0.9M in costs for waste management and environmental compliance. These costs
were included in payback calculation. This recommendation does not otherwise
impact the costs of environmental restoration, waste management or
environmental compliance activities. The aggregate environmental impacts of all
the recommended BRAC actions affecting the installations in this recommendation
have been reviewed. There are no known environmental impediments to
implementation of this recommendation.
Recommendation for Closure
Naval Support Activity Corona, CA
Recommendation: Close Naval Support Activity
Corona, CA. Relocate Naval Surface
Warfare Center Division Corona, CA to Naval Base Ventura County (Naval Air Station Point
Mugu), CA.
Justification: The Naval Surface Warfare
Center Division Corona performs three required missions for Department of the
Navy (Independent Assessment Capability, Metrology and Calibration
Laboratories, and Tactical Aircrew Combat Training System Ranges). It was
analyzed under 11 Research, Development & Acquisition, and Test &
Evaluation functions (Air Platforms Development & Acquisition; Air
Platforms Test & Evaluation; Ground Vehicles Test and Evaluation;
Information Systems Technology Development & Acquisition; Information
Systems Technology Test & Evaluation; Sea Vehicles Development &
Acquisition; Sea Vehicles Test & Evaluation; Sensors, Electronics, and
Electronic Warfare Development & Acquisition; Sensors, Electronics, and
Electronic Warfare Test & Evaluation; Weapons Technology Development &
Acquisition; and Weapons Technology Test & Evaluation). In each functional
area, Naval Surface Warfare Center Division Corona’s quantitative military
value scores fell in the bottom half of facilities performing the same
function, and thus were reviewed for relocation and/or consolidation with like
functions. The Department of the Navy determined it would lose a critical
capability if the 11 functions were relocated to a variety of locations, since
this would fracture the full spectrum warfare center and independent assessment
capability. Considering the overall military value and the fact that Naval
Support Activity Corona was a single function facility,
the Department reviewed the possibility of relocating the Naval Surface Warfare
Center functions to a multi-functional location with the capability to host
these functions. Relocation of Naval Surface Warfare Center Division Corona to
Naval Air Station Point Mugu collocates it with other Research, Development
& Acquisition, and Test & Evaluation activities and with fleet assets
at Naval Air Station Point Mugu. This consolidation of space will provide a
more efficient organization with greater synergies and increased effectiveness.
Relocation of Naval Surface
Warfare Center Division Corona Research, Development & Acquisition, and
Test & Evaluation functions to Naval Air Station Point Mugu removes the
primary mission from Naval Support Activity Corona and eliminates or moves the
entirety of the workforce at Naval Support Activity Corona except for those
personnel associated with the base operations support function. As a result,
retention of Naval Support Activity Corona is no longer necessary.
Payback: The total estimated one-time
cost to the Department of Defense to implement this recommendation is $80.2M.
The net of all costs and savings to the Department during the implementation
period is a cost of $65.5M. Annual recurring savings to the Department after
implementation are $6.0M with a payback expected in 15 years. The net present
value of the costs and savings to the Department over 20 years is a savings of
$0.4M.
Economic Impact on
Communities: Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 1,796 jobs (892 direct jobs and 904 indirect jobs) over the
2006-2011 period in the Riverside-San Bernardino-Ontario, CA, Metropolitan
Statistical Area, which is 0.1 percent of economic area employment. The
aggregate economic impact of all recommended actions on this economic region of
influence was considered and is at Appendix B of Volume I.
Community Infrastructure
Assessment: A
review of community attributes indicates no issues regarding the ability of the
infrastructure of the communities to support missions, forces, and personnel.
There are no known community infrastructure impediments to implementation of
all recommendations affecting the installations in this recommendation.
Environmental Impact: Naval Air Station Point
Mugu, CA, is in Severe Non-attainment for Ozone (1-Hour) but no Air Conformity
Determination will be required. There are potential impacts for cultural,
archeological, or tribal resources; threatened and endangered species; waste
management and wetlands. No impacts are anticipated for dredging; land use
constraints or sensitive resource areas; marine mammals, resources, or
sanctuaries; noise or water resources. This recommendation indicates impacts of
costs at the installations involved, which reported $410 thousand in costs for
waste management and environmental compliance. These costs were included in the
payback calculation. This recommendation does not otherwise impact the costs of
environmental restoration, waste management or environmental compliance
activities. The aggregate environmental impact of all recommended BRAC actions
affecting the installations in this recommendation has been reviewed. There are
no known environmental impediments to implementation of this recommendation.
Recommendation for Closure
Naval Weapons Station Seal Beach Detachment, Concord, CA
Recommendation: Close the Inland area of
Naval Weapons Station Seal Beach Detachment, Concord CA, except
retain such property and facilities as are necessary to support operations in
the Tidal area of Naval Weapons Station Seal Beach Detachment Concord. The
Tidal area of Naval Weapons Station Seal Beach Detachment Concord, along with
the retained portion of the Inland area, shall be transferred to the Army.
Justification: While Department of the Navy
weapons stations have no excess capacity for loading and distribution of
munitions, there is an excess of munitions storage capacity. Because of the
departure of Fleet units from the San Francisco area in the 1990s, Naval
Weapons Station Seal Beach Detachment Concord’s Inland
magazine field has been in a reduced operating status since 1999. At that time,
the Inland area was retained in an effort to minimize risk should a future need
develop to expand storage capacity. The Explosive Safety Quantity Distance arcs
in the Inland area were available to allow safe, temporary holding of railcars
with munitions destined for loading by the Army-managed Marine Ocean Terminal
Concord (at the Tidal area) during high tempo operations. After consultation
with Combatant Commanders, the Army Material Command and the Army component of
the U.S. Transportation Command, the Department of the Navy has concluded this
capability is no longer necessary. The Inland area is excess to Department of
the Navy/DoD needs and is severable. The closure of the Inland area, therefore,
will save money and have no impact on mission capability. The City of Concord
requested closure of both the Inland and Tidal portions of Naval Weapons
Station Seal Beach Detachment Concord. Munitions loading requirements preclude
closing the Tidal area but the Inland area is excess and may be closed. Because
Tidal area operations are in support of the Army component of the U.S.
Transportation Command, transfer of the property to the Army aligns the
property holder with the property user.
Payback: The total estimated one-time
cost to the Department of Defense to implement this recommendation is $14.0M.
The net of all costs and savings to the Department during the implementation
period is a savings of $43.2M. Annual recurring savings to the Department after
implementation are $16.4M with a payback expected in one year. The net present
value of the costs and savings to the Department over 20 years is a savings of
$199.7M.
Economic Impact on
Communities: This
recommendation will not result in any job reductions (direct or indirect) over
the 2006-2011 period in the Oakland-Fremont-Hayward, CA, Metropolitan Division
economic area. The aggregate economic impact of all recommended actions on this
economic region of influence was considered and is at Appendix B of Volume I. Section 2: Recommendations –
Navy and Marine Corps DoN – 10
Community Infrastructure
Assessment: A
review of community attributes indicates no issues regarding the ability of the
infrastructure of the communities to support missions, forces, and personnel.
There are no known community infrastructure impediments to implementation of
all recommendations affecting the installations in this recommendation.
Environmental Impact: Naval Weapons Station Seal
Beach Detachment Concord, CA, is in Extreme Non-attainment for Ozone
(1-Hour) but no Air Conformity Determination will be required. There are
potential impacts for cultural, archeological, or tribal resources; threatened
and endangered species or critical habitat; and wetlands that may impact new
construction. No impacts are anticipated for dredging, land use constraints or
sensitive resource areas; marine mammals, resources, or sanctuaries; noise;
waste management or water resources. This recommendation indicates impacts of
costs at the installation involved, which indicated $0.3M in costs for waste
management and environmental compliance. These costs were included in the payback
calculation. This recommendation does not otherwise impact the costs of
environmental restoration, waste management, or environmental compliance
activities. The aggregate environmental impact of all recommended BRAC actions
affecting the installations in this recommendation has been reviewed. There are
no known environmental impediments to implementation of this recommendation.
Recommendation for Closure and Realignment Naval Station Ingleside, TX and Naval Air Station Corpus Christi, TX
Recommendation: Close Naval Station
Ingleside, TX. Relocate its ships along with dedicated personnel, equipment and
support to Naval Station San Diego, CA. Relocate the ship intermediate repair function to Shore
Intermediate Maintenance Activity San Diego, CA. Consolidate Mine Warfare
Training Center with Fleet Anti-submarine Warfare Training Center San Diego,
CA. Realign Naval Air Station Corpus Christi, TX. Relocate Commander Mine
Warfare Command and Commander Mobile Mine Assembly Group to Fleet
Anti-Submarine Warfare Center, Point Loma, CA. Relocate Helicopter Mine Countermeasures Squadron 15 (HM-15) and
dedicated personnel, equipment and support to Naval Station Norfolk, VA. Disestablish
Commander Helicopter Tactical Wing U.S. Atlantic Fleet Aviation Intermediate
Maintenance Detachment Truax Field at Naval Air Station Corpus Christi, TX and
relocate its intermediate maintenance function for Aircraft Components,
Fabrication & Manufacturing, and Support Equipment to Fleet Readiness
Center Mid-Atlantic Site Norfolk, VA.
Justification: This recommendation moves
mine warfare surface and aviation assets to major fleet concentration areas and
reduces excess capacity. Gulf Coast presence can be achieved as needed with
available Navy ports at Naval Air Station Key West, FL, and Naval Air Station
Pensacola, FL. The Minehunter Coastal ships at Naval Station Ingleside are
scheduled for decommissioning between FY 2006 and FY 2008 and will not
relocate. Additionally, U.S. Coast Guard presence is expected to remain in the
Gulf Coast region. Relocation of Commander Mine Warfare Command and the Mine
Warfare Training Center to San Diego, CA, creates a center of excellence for
Undersea Warfare, combining both mine warfare and anti-submarine warfare
disciplines. This reorganization removes the Mine Warfare community from a
location remote from the fleet thereby better supporting the shift to organic
mine warfare. This recommendation also supports mission elimination at Shore
Intermediate Maintenance Activity Naval Reserve Maintenance Facility Ingleside,
TX, and Aviation Intermediate Maintenance Detachment Truax Field at Naval Air
Station Corpus Christi and reduces excess repair capacity. The relocation of
Helicopter Mine Countermeasures Squadron 15 (HM-15) to Naval Station Norfolk
single sites all Mine Warfare Aircraft in a fleet concentration area. This
location better supports the HM-15 mission by locating them closer to the C-5
transport Air Port of Embarkation for overseas employment and mine
countermeasures ship and helicopter coordinated exercises.
Payback: The total estimated one-time
cost to the Department of Defense to implement this recommendation is $178.4M.
The net of all costs and savings to the Department during the implementation
period is a savings of $100M. Annual recurring savings to the Department after
implementation are $75.6M with a payback expected in two years. The net present
value of the costs and savings to the Department over 20 years is a savings of
$822.2M.
Economic Impact on
Communities: Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 6,864 jobs (3,184 direct jobs and 3,680 indirect jobs) over the
2006-2011 period in the Corpus Christi, TX, Metropolitan Statistical Area,
which is 3.1 percent of economic area employment. The aggregate economic impact
of all recommended actions on this economic region of influence was considered
and is at Appendix B of Volume I.
Community Infrastructure
Assessment: A
review of community attributes indicates no issues regarding the ability of the
infrastructure of the communities to support missions, forces, and personnel.
There are no known community infrastructure impediments to implementation of
all recommendations affecting the installations in this recommendation.
Environmental Impact: Naval Station San Diego, CA, is in Maintenance for Ozone (1-Hour), but an Air Conformity
Determination is not required. There are potential impacts for dredging and
wetlands. Anti-Submarine Warfare Center Point Loma is in Maintenance for Ozone (1-
Hour), but an Air Conformity Determination will not be required. There are
potential impacts to the resource areas of land use constraints or sensitive
resources. Naval Station Norfolk, VA is in Maintenance for Ozone (1-Hour) and
Marginal Non-attainment for Ozone (8-Hour) and no Air Conformity Determination
is required. No impacts are anticipated regarding the other resource areas of
cultural, archeological, or tribal resources; marine mammals, resources, or
sanctuaries; noise; threatened and endangered species; waste management; or
water resources. This recommendation indicates impacts of costs at the
installations involved, which reported $1.0M in costs for waste management and
environmental compliance. These costs were included in the payback calculation.
This recommendation does not otherwise impact the costs of environmental
restoration, waste management or environmental compliance activities. The
aggregate environmental impact of all recommended BRAC actions affecting the
installations in this recommendation has been reviewed. There are no known
environmental impediments to implementation of this recommendation.
Recommendation: Close Naval Facilities
Engineering Field Division South leased space in Charleston, SC. Consolidate
Naval Facilities Engineering Field Division South, Charleston, SC, with Naval
Facilities Engineering Field Activity Southeast, Jacksonville, FL, at Naval Air
Station Jacksonville, FL; Naval Facilities Midwest, Great Lakes, IL, at Naval
Station Great Lakes, IL; and Naval Facilities Atlantic, Norfolk, VA at Naval
Station Norfolk, VA. Close Naval Facilities Engineering Field Activity
Northeast leased space in Lester, PA. Consolidate Naval Facilities Engineering
Field Activity Northeast, Philadelphia, PA, with Naval Facilities Atlantic,
Norfolk, VA at Naval Station Norfolk, VA and relocate Navy Crane Center Lester,
PA, to Norfolk Naval Shipyard, Norfolk, VA.
Justification: This recommendation
enhances the Navy’s long-standing initiative to accomplish common management
and support on a regionalized basis by consolidating and collocating Naval
Facilities commands with the installation management Regions in Jacksonville,
FL, Great Lakes, IL and Norfolk, VA. This collocation aligns management
concepts and efficiencies and may allow for further consolidation in the future.
Naval Facilities Engineering Field Division South, Naval Facilities Engineering
Field Activity Northeast and Navy Crane Center are located in leased space, and
this recommendation will achieve savings by moving from leased space to
government-owned space. Naval Facilities Engineering Command is undergoing
organizational transformation, and this recommendation facilitates the
evolution of organizational alignment. This recommendation will result in an
increase in the average military value for the remaining Naval Facilities
Engineering Field Division/Engineering Field Activity activities, and it
relocates the Navy Crane Center to a site with functional synergy.
Payback: The total estimated
one-time cost to the Department of Defense to implement this recommendation is
$37.9M. The net of all costs and savings during the implementation period is a
cost of $9.1M. Annual recurring savings to the Department after implementation
are $9.3M with a payback expected in four years. The net present value of the
costs and savings to the Department over 20 years is a savings of $81.8M.
Economic Impact on
Communities: Assuming
no economic recovery, this recommendation could result in a maximum potential reduction
of 1,433 jobs (543 direct jobs and 890 indirect jobs) over the 2006-2011 period
in the Charleston-North Charleston, SC Metropolitan Statistical Area, which is
0.43 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
447 jobs (247 direct jobs and 200 indirect jobs) over the 2006-2011 period in
the Philadelphia, PA Metropolitan Division, which is less than 0.1 percent of
economic area employment.
The aggregate economic
impact of all recommended actions on these economic regions of influence was
considered and is at Appendix B of Volume I.
Community Infrastructure
Assessment: A
review of community attributes indicates no issues regarding the ability of the
infrastructure of the communities to support missions, forces, and personnel.
There are no known community infrastructure impediments to implementation of
all recommendations affecting the installations in this recommendation.
Environmental Impact: Naval Air Station
Jacksonville, FL is in Maintenance for Ozone (1- Hour) and Attainment for all
other criteria pollutants. No Air Conformity determination will be required.
There are potential impacts for cultural, archeological and tribal resources;
and wetlands. Naval Station Great Lakes, IL is in Severe Non-Attainment for
Ozone (1-Hour) and Moderate Non-Attainment for Ozone (8-Hour). An Air
Conformity Determination is not required. Naval Shipyard Norfolk, VA is in
Maintenance for Ozone (1-Hour) and Marginal Non- Attainment for Ozone (8-Hour).
An Air Conformity Determination is not required. Water Resources will be
impacted. There are no anticipated impacts for air quality; dredging; land use
constraints or sensitive resource areas; marine mammals, resources or sanctuaries;
noise; threatened and endangered species or critical habitat; waste management;
or water resources. This recommendation indicates impacts of costs at the
installations involved, which reported $0.008M in costs for environmental
compliance. These costs were included in the payback calculation. This
recommendation does not otherwise impact the costs of environmental
restoration, waste management or environmental compliance activities. The
aggregate environmental impact of all recommended BRAC actions affecting the
installations in this recommendation has been reviewed. There are no known
environmental impediments to implementation of this recommendation.
Recommendation:Close Navy Marine Corps
Reserve Center Encino, CA and relocate the Marine Corps units to Marine Corps Reserve Center
Pasadena, CA.
Close Navy Marine Corps
Reserve Center Moundsville, WV and relocate the Marine Corps units to Navy
Marine Corps Reserve Center Pittsburgh, PA.
Close Navy Marine Corps
Reserve Center Reading, PA and relocate the Navy and Marine Corps units to Navy
Marine Corps Reserve Centers Lehigh Valley, PA.
Close Navy Marine Corps
Reserve Center Los Angeles, CA and relocate the Navy and Marine Corps units to Armed Forces
Reserve Center Bell, CA.
Close Navy Marine Corps
Reserve Center Akron, OH and Navy Reserve Center Cleveland, OH and relocate the
Navy and Marine Corps units to Armed Forces Reserve Center Akron, OH.
Close Navy Marine Corps
Reserve Center Madison, WI, Navy Reserve Center Lacrosse, WI and Navy Reserve
Center Dubuque, IA and relocate the Navy and Marine Corps units to Armed Forces
Reserve Center Madison, WI.
Close Navy Marine Corps
Reserve Center Baton Rouge, LA and relocate the Marine Corps units to Armed
Forces Reserve Center Baton Rouge, LA.
Close Navy Marine Corps
Reserve Center Tulsa, Ok and relocate the Navy and Marine Corps units to Armed
Forces Reserve Center Broken Arrow, OK.
Close Navy Marine Corps
Reserve Center Mobile, AL and relocate the Marine Corps units to Armed Forces Reserve
Center Mobile, AL.
Close Inspector-Instructor
West Trenton, NJ and relocate Marine Corps reserve units and support staff to
Navy Reserve Center Ft. Dix, NJ.
Close Inspector-Instructor
Rome, GA, and relocate Marine Corps reserve units and support staff to Navy
Marine Corps Reserve Center Atlanta, GA.
Justification: This recommendation will
reduce excess capacity through the consolidation of 12 Navy Reserve Centers and
Navy Marine Corps Reserve Centers with other reserve centers in the effected areas
or into Armed Forces Reserve Centers. Nine of 12 of the reserve center closures
are joint actions with the Department of the Army that support relocation into
Armed Forces Reserve Centers. This recommendation will also relocate two
Inspector-Instructor activities to existing reserve facilities aboard active
duty bases. Sufficient capacity for drilling reserves is maintained throughout
the United States, and all states will continue to have at least one Navy/Navy
Marine Corps Reserve Center. This recommendation reduces excess capacity in the
Department of the Navy reserve center functional area, but existing capacity in
support of the Department of the Navy Reserve component continues to be in
excess of force structure requirements. This recommendation is part of the
closure of 37 Department of the Navy reserve centers, which includes 35 Navy
centers (Navy Reserve Centers, Navy Reserve Facilities and Navy Marine Corps
Reserve Centers) and two Marine Corps centers (Inspector-Instructor
activities). The closure of 35 Navy centers will result in a capacity reduction
of 12.7 percent of total current square footage. The closure of two Marine
Corps centers will result in a capacity reduction of 5.5 percent of total
current square footage.
Payback: The total estimated one time
cost to the Department of Defense to implement the closure of Navy Marine Corps
Reserve Center Encino, CA, is $0.1M. The net of all costs and savings during the
implementation period is a savings of $4.6M. Annual recurring savings to the
Department after implementation are $0.8M with an immediate payback. The net
present value of the costs and savings to the Department over 20 years is a
savings of $12.3M.
The total estimated one time
cost to the Department of Defense to implement the closure of Navy Marine Corps
Reserve Center Moundsvillle, WV, is $0.2M. The net of all costs and savings to
the Department during the implementation period is a savings of $4.7M. Annual
recurring savings to the Department after implementation are $0.9M with an
immediate payback. The net present value of the costs and savings to the
Department over 20 years is a savings of $13.0M.
The total estimated one time
cost to the Department of Defense to implement the closure of Navy Marine Corps
Reserve Center Reading, PA, is $9.1M. The net of all costs and savings to the
Department during the implementation period is a cost of $5.0M. Annual
recurring savings to the Department after implementation are $1.0M with a payback
expected in 12 years. The net present value of the costs and savings to the
Department over 20 years is a savings of $4.1M.
The total estimated one time
cost to the Department of Defense to implement the closure of Navy Marine Corps
Reserve Center Los Angeles, CA, is $12.2M. The net of all costs and savings to the Department
during the implementation period is a cost of $8.0M. Annual recurring savings
to the Department after implementation are $0.9M with a payback expected in 18
years. The net present value of the costs and savings to the Department over 20
years is a savings of $0.5M.
The total estimated one time
cost to the Department of Defense to implement the closure of Navy Marine Corps
Reserve Center Akron, OH, and Navy Reserve Center Cleveland, OH, is $11.8M. The
net of all costs and savings to the Department during the implementation period
is a cost of $4.2M. Annual recurring savings to the Department after
implementation are $1.7M with a payback expected in 7 years. The net present
value of the costs and savings to the Department over 20 years is a savings of
$11.8M.
The total estimated one time
cost to the Department of Defense to implement the closure of Navy Marine Corps
Reserve Center Madison, WI and Navy Reserve Center Lacrosse, WI, and Navy
Reserve Center Dubuque, IA, is $10.2M. The net of all costs and savings during
the implementation period is a cost of $3.7M. Annual recurring savings to the
Department after implementation are $1.8M with a payback expected in 6 years.
The net present value of the costs and savings to the Department over 20 years
is a savings of $13.6M.
The total estimated one time
cost to the Department of Defense to implement the closure of Navy Marine Corps
Reserve Center Baton Rouge, LA, is $3.9M. The net of all costs and savings to
the Department during the implementation period is a savings of $0.9M. Annual
recurring savings to the Department after implementation are $1.0M with a
payback expected in 3 years. The net present value of the costs and savings to
the Department over 20 years is a savings of $10.2M.
The total estimated one time
cost to the Department of Defense to implement the closure of Navy Marine Corps
Reserve Center Tulsa, OK, is $5.5M. The net of all costs and savings to the
Department during the implementation period is a cost of $3.7M. Annual
recurring savings to the Department after implementation are $0.5M with a
payback expected in 14 years. The net present value of the costs and savings to
the Department over 20 years is a savings of $1.1M.
The total estimated one time
cost to the Department of Defense to implement the closure of Navy Marine Corps
Reserve Center Mobile, AL, is $8.0M. The net of all costs and savings to the
Department during the implementation period is a cost of $4.6M. Annual
recurring savings to the Department after implementation are $0.7M with a
payback expected in 12 years. The net present value of the costs and savings to
the Department over 20 years is a savings of $2.4M.
The total estimated one time
cost to the Department of Defense to implement the closure of
Inspector-Instructor West Trenton, NJ, is $1.3M. The net of all costs and
savings to the Department during the implementation period is a savings of
$1.4M. Annual recurring savings to the Department after the implementation
period are $0.5M with a payback expected in 3 years. The net present value of
the costs and savings to the Department over 20 years is a savings of $5.9M.
The total estimated one time
cost to the Department of Defense to implement the closure of
Inspector-Instructor Rome, GA, is $0.05M. The net of all costs and savings to
the Department during the implementation period is a savings of $0.6M. Annual
recurring savings to the Department after implementation are $0.1M with an
immediate payback. The net present value of the costs and savings to the
Department over 20 years is a savings of $1.9M.
Economic Impact on
Communities: Assuming
no economic recovery, the closure of Navy Marine Corps Reserve Center Encino, CA will result in a maximum potential reduction of 12 jobs (8 direct
jobs and 4 indirect jobs) over the 2006-2011 period in the Los Angeles-Long
Beach-Glendale, CA, Metropolitan Statistical Area, which is less than 0.1
percent of economic area employment.
Assuming no economic
recovery, the closure of Navy Marine Corps Reserve Center Moundsville, WV, will
result in a maximum potential reduction of 21 jobs (16 direct jobs and 5
indirect jobs) over the 2006-2011 period in the Wheeling, WV-OH, Metropolitan
Statistical Area, which is less than 0.1 percent of economic area employment.
Assuming no economic
recovery, the closure of Navy Marine Corps Reserve Center Reading, PA, could
result in a maximum potential reduction of 25 jobs (18 direct jobs and 7
indirect jobs) over the 2006-2011 period in the Reading, PA, Metropolitan
Statistical Area, which is less than 0.1 percent of economic area employment.
The closure of Navy Marine
Corps Reserve Center Los Angeles, CA, will not result in any job reductions (direct or indirect) over
the 2006-2011 period in the Los Angeles-Long Beach- Glendale, CA, Metropolitan
Division. Navy Marine Corps Reserve Center Los Angeles and Armed Forces Reserve
Center Bell are in the same Metropolitan
Division.
Assuming no economic
recovery, the closure of Navy Marine Corps Reserve Center Akron, OH, and Navy
Reserve Center Cleveland, OH will result in a maximum potential reduction of 34
jobs (25 direct jobs and 9 indirect jobs) over the 2006-2011 period in
Cleveland-Elyria-Mentor, OH, Metropolitan Statistical Area, which is less than
0.1 percent of economic area employment. Navy Marine Corps Reserve Center Akron
and Armed Forces Reserve Center Akron are in the same Metropolitan Statistical
Area.
Assuming no economic
recovery, the closure of Navy Marine Corps Reserve Center Madison, WI, and Navy
Reserve Center Lacrosse, WI, and Navy Reserve Center Dubuque, IA, will result Section 2: Recommendations –
Navy and Marine Corps DoN – 33 in a maximum potential reduction of 9 jobs (7 direct jobs and
2 indirect jobs) over the 2006-2011 period in the LaCrosse, WI-MN, Metropolitan
Statistical Area, which is less than 0.1 percent of economic area employment.
Assuming no economic
recovery, the closure of Navy Marine Corps Reserve Center Madison, WI, and Navy
Reserve Center Lacrosse, WI and Navy Reserve Center Dubuque, IA, will result in
a maximum potential reduction of 32 jobs (24 direct jobs and 8 indirect jobs)
over the 2006- 2011 period in the Dubuque, IA, Metropolitan Statistical Area,
which is less than 0.1 percent of economic area employment. Navy Marine Corps
Reserve Center Madison and Armed Forces Reserve Center Madison are in the same
Metropolitan Statistical Area.
Assuming no economic
recovery, the closure of Navy Marine Corps Reserve Center Baton Rouge, LA, will
result in a maximum potential reduction of 10 jobs (7 direct jobs and 3
indirect jobs) over the 2006-2011 period in the Baton Rouge, LA, Metropolitan
Statistical Area, which is less than 0.1 percent of economic area employment.
The closure of Navy Marine
Corps Reserve Center Tulsa, OK, will not result in any job reductions (direct
or indirect) over the 2006-2011 period in the Tulsa, OK, Metropolitan
Statistical Area. Navy Marine Corps Reserve Center Tulsa and Armed Forces
Reserve Center Broken Arrow are in the same Metropolitan Statistical Area.
Assuming no economic
recovery, the closure of Navy Marine Corps Reserve Center Mobile, AL, will
result in a maximum potential reduction of 7 jobs (5 direct jobs and 2 indirect
jobs) over the 2006-2011 period in the Mobile, AL, Metropolitan Statistical
Area, which is less than 0.1 percent of economic area employment. Navy Marine
Corps Reserve Center Mobile and Armed Forces Reserve Center Mobile are in the
same Metropolitan Statistical Area.
Assuming no economic
recovery, the closure of Inspector-Instructor West Trenton, NJ, could result in
a maximum potential reduction of 16 jobs (12 direct jobs and 4 indirect jobs)
over the 2006-2011 period in the Trenton-Ewing, NJ, Metropolitan Statistical
Area, which is less than 0.1 percent of economic area employment.
Assuming no economic
recovery, the closure of Inspector-Instructor Rome, GA, could result in a
maximum potential reduction of 12 jobs (9 direct jobs and 3 indirect jobs) over
the 2006-2011 period in the Rome, GA, Metropolitan Statistical Area, which is
less than 0.1 percent of economic area employment.
The aggregate economic
impact of all recommended actions on these economic regions of influence was
considered and is at Appendix B of Volume I.
Community Infrastructure
Assessment: A
review of community attributes indicates no issues regarding the ability of the
infrastructure of the communities to support missions, forces, and personnel.
There are no known community infrastructure impediments to implementation of
all recommendations affecting the installations in this recommendation.
Environmental Impact: This recommendation has no
impact on air quality; cultural, archeological, or tribal resources; dredging;
land use constraints or sensitive resource areas; marine mammals, resources, or
sanctuaries; noise; threatened or endangered species or critical habitat; waste
management; water resources; or wetlands. This recommendation indicates impacts
of costs at the installations involved, which reported $0.1M in costs for
environmental compliance activities. These costs were included in the payback
calculation. This recommendation does not otherwise impact the costs of
environmental restoration, waste management, or environmental compliance
activities. The aggregate environmental impact of all recommended BRAC actions
affecting the installations in this recommendation has been reviewed. There are
no known environmental impediments to implementation of this recommendation.
Beale
Air Force Base, CA, and Selfridge Air National Guard Base, MI
Recommendation:
Realign
Beale Air Force Base, CA. The 940th Air Refueling Wing (AFR) will realign its KC-135R
tanker aircraft while its expeditionary combat support (ECS) elements will
remain in place. Beale’s KC-135R aircraft will be distributed to the Air
National Guard at Selfridge ANGB, MI (four aircraft) and 134th Air Refueling
Wing (ANG), McGhee-Tyson Airport Air Guard Station, TN (four aircraft). Realign
Selfridge Air Reserve Base, MI. The 927th Air Refueling Wing (AFR) at Selfridge
will distribute its eight KC-135 aircraft to the 127th Wing (ANG) at Selfridge.
The 127th Wing will retire its 15 F-16 aircraft and eight C- 130E aircraft, and
will convert to A-10 and KC-135R aircraft.
Justification:
This
recommendation capitalizes on Beale’s (7-C2ISR and 33-UAV) high military value
and emerging Global Hawk unmanned aerial vehicle (UAV) mission. Realigning
KC-135 force structure enables Beale to have one primary operational flying
mission–manned and unmanned high altitude reconnaissance, balances the Reserve
and Air National Guard KC- 135 force structure, and retains reserve component
manpower and experience for the new Global Hawk mission. The receiver locations
for Beale’s tankers–Selfridge (57) and McGhee-Tyson (74)–each have above
average military value for reserve component bases in the tanker mission.
Beale’s more modern KC-135R aircraft will replace the older, higher maintenance
KC-135E models at McGhee-Tyson and help increase the new ANG tanker mission at
Selfridge to an effective-size of 12 aircraft. The resulting KC-135R increase
at Selfridge and McGhee-Tyson robusts the tanker force structure into squadron
sizes that are more operationally effective.
As
a reserve component base, Selfridge ANGB has above average military value as
both a tanker installation (57) and fighter installation (70) as rated for
those respective mission areas. This recommendation streamlines operations at
Selfridge ANGB by realigning the Reserve air refueling mission, currently
operating as a tenant unit, and divesting the ANG wing of its retiring force
structure. The ANG wing’s older, less capable C-130E and F-16 aircraft will
retire and be replaced with Reserve KC-135R aircraft from Selfridge and Beale,
and 15 A-10 aircraft realigned by the recommended closures of W.K. Kellogg
Airport Air Guard Station, MI, and NAS Willow Grove, PN. Reorganizing the
flying operations under one component (ANG) will maximize organizational
effectiveness and allow the installation to accommodate two effectively sized
squadrons. The 927th Air Refueling Wing will realign to associate with the 6th
Air Mobility Wing at MacDill Air Force Base, FL, to capture reserve experience
in the region and enhance that unit’s capability.
Payback:
The total
estimated one-time cost to the Department of Defense to implement this
recommendation is $45.4M. The net of all costs and savings to the Department
during the implementation period is a cost of $34.6M. Annual recurring savings
after implementation are $3.9M, with a payback expected in 14 years. The net
present value of the cost and savings to the Department over 20 years is a
savings of $6.4M.
Economic
Impact on Communities: Assuming no economic recovery, this recommendation could result in a
maximum potential reduction of 312 jobs (179 direct jobs and 133 indirect jobs)
over 2006-2011 period in the Yuba City, CA, Metropolitan Statistical economic
area, which is 0.5 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 52 jobs (18 direct jobs and 34 indirect jobs) over 2006-2011
period in the Warren- Farmington Hills-Troy, MI, economic area, which is less
than 0.1 percent of economic area employment.
The
aggregate economic impact of all recommended actions on these economic regions
of influence was considered and is at Appendix B of Volume I.
Community
Infrastructure Assessment: A review of the community attributes indicates no issues regarding the
ability of the infrastructure of the communities to support missions, forces
and personnel. There are no known community infrastructure impediments to
implementation of all recommendations affecting the installations in this
recommendation.
Environmental
Impact: There
are potential impacts to air quality; cultural, archeological, or tribal
resources; land use constraints or sensitive resource areas; noise; threatened
and endangered species or critical habitat; waste management; water resources;
and wetlands that may need to be considered during the implementation of this
recommendation. There are no anticipated impacts to dredging; or marine
mammals, resources, or sanctuaries. Impacts of costs include $0.3M in costs for
environmental compliance and waste management. These costs were included in the
payback calculation. There are no anticipated impacts to the costs of
environmental restoration. The aggregate environmental impact of all
recommended BRAC actions affecting the installations in this recommendation has
been reviewed. There are no known environmental impediments to the
implementation of this recommendation.
March
Air Reserve Base, CA
Recommendation:
Realign
March Air Reserve Base, CA. The 163d Air Refueling
Wing (ANG) will distribute its nine KC-135R aircraft to the 452d Air Mobility
Wing (AFR), March Air Reserve Base (four aircraft); the 157th Air Refueling
Wing (ANG), Pease International Tradeport Air Guard Station, NH (three
aircraft); the 134th Air Refueling Wing (ANG), McGhee-Tyson Airport Air Guard
Station, TN (one aircraft); and the 22d Air Refueling Wing, McConnell Air Force
Base, KS (one aircraft). The 163d Air Refueling Wing’s expeditionary combat
support (ECS) will remain in place.
Justification:
This
recommendation realigns aircraft and organizationally optimizes March Air
Reserve Base. With the highest military value (16) of all air reserve component
bases for the tanker mission, March Air Reserve Base is retained and
streamlined from two wing organizational structures to one reserve component
flying mission with a more effectively sized KC-135 unit of 12 aircraft. This
action distributes the remaining Air National Guard force structure at March to
the higher-ranking active installation, McConnell (15), and two ANG
installations, McGhee-Tyson (74) and Pease (105). McGhee-Tyson, though rated
lower in military value, receives one aircraft due to military judgment to
robust the squadron to a more effective size of 12 aircraft. Military judgment
also placed additional force structure at Pease to support the Northeast Tanker
Task Force and also robust the squadron to a more effective size of 12
aircraft. All receiver installations are increased in operational capability
with the additional aircraft because of their proximity to air refueling
missions. March’s ECS remains in place to support the Air Expeditionary Force
and to retain trained and experienced Air National Guard personnel.
Payback:
The total
estimated one-time cost to the Department of Defense to implement this
recommendation is $10.8M. The net of all costs and savings to the Department
during the implementation period is a cost of $1.9M. Annual recurring savings
to the Department after implementation are $1.8M, with a payback expected in
five years. The net present value of the cost and savings to the Department
over 20 years is a savings of $15.5M.
Economic
Impact on Communities: Assuming no economic recovery, this recommendation could result in a
maximum potential reduction of 201 jobs (111 direct jobs and 90 indirect jobs)
over 2006-2011 period in the Riverside-San Bernardino-Ontario, CA, Metropolitan
Statistical economic area, which is 0.01 percent of economic area employment.
The aggregate economic impact of all recommended actions on this economic
region of influence was considered and is at Appendix B of Volume I.
Community
Infrastructure Assessment: A review of the community attributes indicates no issues regarding the
ability of the infrastructure of the communities to support missions, forces
and personnel. There are no known community infrastructure impediments to
implementation of all recommendations affecting the installations in this
recommendation.
Environmental
Impact: There
are potential impacts to air quality; cultural, archeological, or tribal
resources; land use constraints or sensitive resource areas; noise; threatened
and endangered species or critical habitat; waste management; water resources; and
wetlands that may need to be considered during the implementation of this
recommendation. There are no anticipated impacts to dredging; or marine
mammals, resources, or sanctuaries. Impacts of costs include $0.4M in costs for
environmental compliance and waste management. These costs were included in the
payback calculation. There are no anticipated impacts to the costs of
environmental restoration. The aggregate environmental impact of all
recommended BRAC actions affecting the installations in this recommendation
have been reviewed. There are no known environmental impediments to the
implementation of this recommendation.
Onizuka Air Force
Station, CA
Recommendation:
Close
Onizuka Air Force Station, CA. Relocate the Air Force Satellite Control
Network (AFSCN) mission and tenant Defense Information Systems Agency (DISA)
Defense Satellite Communication System (DSCS) mission and equipment to
Vandenberg Air Force Base, CA.
Justification:
This
recommendation consolidates satellite command and control operations while
reducing excess infrastructure. Onizuka AFS (124) hosts the AFSCN
Second Node and scheduling backup mission, but has no primary assigned Air
Force Space Command operational mission. Onizuka AFS also supports classified
tenant missions that are anticipated to phase out during the BRAC 2005
timeframe. Schriever Air Force Base, CO (1) ranked highest in military value
for satellite operations, but hosts the AFSCN Primary Node. Vandenberg Air
Force Base (2) currently hosts one of the AFSCN remote tracking stations. An
Air Force Space Command policy directive on backup satellite control operations
prescribes the requirements for backup operations and geographical separation
to preclude simultaneous degradation of both primary and secondary nodes from
natural or man-made threats. During major command capacity briefings to
Headquarters Air Force, Onizuka AFS was identified as having
seismic and antiterrorism/ force protection constraints, with no buildable land
to mitigate these. Vandenberg Air Force Base offers better protection for the
DSCS Sun East and Sun West antenna complexes, which are designated a
Protection-Level 1 resource.
Payback:
The total
estimated one-time cost to the Department of Defense to implement this
recommendation is $123.7M. The net of all costs and savings to the Department
during the implementation period is a cost of $45.3M. Annual recurring savings
to the Department after implementation are $25.9M, with a payback expected in
five years. The net present value of the cost and savings to the Department
over 20 years is a savings of $211.0M.
Economic
Impact on Communities: Assuming no economic recovery, this recommendation could result in a
maximum potential reduction of 393 jobs (278 direct jobs and 115 indirect jobs)
over the 2006-2011 period in the San Jose-Sunnyvale-Santa Clara, CA,
Metropolitan Statistical economic area, which is less than 0.1 percent of
economic area employment. The aggregate economic impact of all recommended
actions on these economic regions of influence was considered and is at
Appendix B of Volume I.
Community
Infrastructure Assessment: A review of community attributes indicates no issues regarding the
ability of the infrastructure of the communities to support missions, forces
and personnel. There are no known community infrastructure impediments to
implementation of all recommendations affecting the installations in this
recommendation.
Environmental
Impact: There
are potential impacts to air quality; cultural, archeological, or tribal
resources; land use constraints or sensitive resource areas; threatened and endangered
species or critical habitat; and wetlands that may need to be considered during
the implementation of this recommendation. There are no anticipated impacts to
dredging; marine mammals, resources, or sanctuaries; noise; waste management;
or water resources. Impacts of costs include $0.04M in costs for environmental
compliance and waste management. These costs were included in the payback
calculation. There are no anticipated impacts to the costs of environmental
restoration. The aggregate environmental impact of all recommended BRAC actions
affecting the installations in this recommendation have been reviewed. There
are no known environmental impediments to the implementation of this
recommendation.
Recommendation:
Realign
Reno-Tahoe International Airport Air Guard Station, NV. Distribute the eight
C-130H aircraft of the 152d Airlift Wing (ANG) to the 189th Airlift Wing (ANG),
Little Rock Air Force Base, AR. Flying related Expeditionary Combat Support
(ECS) moves to Channel Islands Air Guard Station, CA (aerial port), and Fresno Air Guard Station, CA (fire fighters). The remaining ECS elements and the Distributed
Common Ground System (DCGS) remain in place.
Justification:
This
recommendation distributes C-130 force structure to a higher military value
base. Because of limitations to land and ramp space, Reno was unable to expand
beyond 10 C- 130s. This recommendation realigns Reno’s (101) C-130s to the Air
National Guard at Little Rock Air Force Base (17), where a larger, more
effective squadron size is possible. This larger squadron at Little Rock also
creates the opportunity for an association between active duty and the Air
National Guard, optimizing aircraft utilization.
Payback:
The total
estimated one-time cost to the Department of Defense to implement this
recommendation is $22.9M. The net of all costs and savings to the Department
during the implementation period is a cost of $12.2M. Annual recurring savings
to the Department after implementation are $3.6M, with a payback expected in 9
years. The net present value of the cost and savings to the Department over 20
years is a savings of $22.7M.
Economic
Impact on Communities: Assuming no economic recovery, this recommendation could result in a
maximum potential reduction of 263 jobs (147 direct jobs and 116 indirect jobs)
over the 2006-2011 period in the Reno-Sparks, NV, Metropolitan Statistical
economic area, which is 0.1 percent of economic area employment. The aggregate
economic impact of all recommended actions on this economic region of influence
was considered and is at Appendix B of Volume I.
Community
Infrastructure Assessment: A review of community attributes indicates no issues regarding the
ability of the infrastructure of the communities to support forces, missions
and personnel. There are no known community infrastructure impediments to
implementation of all recommendations affecting the installations in this
recommendation.
Environmental
Impact: There
are potential impacts to air quality; cultural, archeological, or tribal
resources; land use constraints or sensitive resource areas; noise; threatened
and endangered species or critical habitat; waste management; water resources;
and wetlands that may need to be considered during the implementation of this
recommendation. There are no anticipated impacts to dredging; or marine mammals,
resources, or sanctuaries. Impacts of costs include $0.09M in costs for
environmental compliance and waste management. These costs were included in the
payback calculation. There are no anticipated impacts to the costs of
environmental restoration. The aggregate environmental impact of all
recommended BRAC actions affecting the installations in this recommendation
have been reviewed. There are no known environmental impediments to the
implementation of this recommendation.
Pope Air Force Base, NC, Pittsburgh International Airport Air Reserve Station, PA, and Yeager Air Guard Station, WV
Recommendation:
Realign
Pope Air Force Base (Air Force Base), NC. Distribute the 43d Airlift Wing’s
C-130E aircraft (25 aircraft) to the 314th Airlift Wing, Little Rock Air Force
Base, AR; realign the 23d Fighter Group’s A-10 aircraft (36 aircraft) to Moody
Air Force Base, GA; transfer real property accountability to the Army;
disestablish the 43rd Medical Group and establish a medical squadron. At Little
Rock Air Force Base, AR, realign eight C-130E aircraft to backup inventory;
retire 27 C-130Es; realign one C-130J aircraft to the 143d Airlift Wing (ANG),
Quonset State Airport Air Guard Station, RI; two C-130Js to the 146th Airlift
Wing (ANG), Channel Islands Air Guard Station, CA; and transfer four C-130Js from the 314th Airlift Wing (AD) to the
189th Airlift Wing (ANG), Little Rock Air Force Base.
Realign
Yeager Airport Air Guard Station (AGS), WV, by realigning eight C-130H aircraft
to Pope/Fort Bragg to form a 16 aircraft Air Force Reserve/active duty
associate unit, and by relocating flying-related expeditionary combat support
(ECS) to Eastern West Virginia Regional Airport/Shepherd Field AGS (aerial port
and fire fighters). Close Pittsburgh International Airport (IAP) Air Reserve
Station (ARS), PA, and relocate 911th Airlift Wing’s (AFRC) eight C-130H
aircraft to Pope/Fort Bragg to form a 16 aircraft Air Force Reserve/active duty
associate unit. Relocate AFRC operations and maintenance manpower to Pope/Fort
Bragg. Relocate flight related ECS (aeromedical squadron) to Youngstown-Warren
Regional APT ARS. Relocate all remaining Pittsburgh ECS and headquarters
manpower to Offutt Air Force Base, NE. Air National Guard units at Pittsburgh
are unaffected.
Justification:
Downsizing
Pope Air Force Base takes advantage of mission-specific consolidation
opportunities to reduce operational costs, maintenance costs and the manpower
footprint. The smaller manpower footprint facilitates transfer of the
installation to the Army. Active duty C-130s and A-10s will move to Little Rock
(17-airlift) and Moody (11-SOF/CSAR), respectively, to consolidate force
structure at those two bases and enable Army recommendations at Pope. At Little
Rock, older aircraft are retired or converted to back-up inventory and J-model
C-130s are aligned under the Air National Guard. Little Rock grows to become
the single major active duty C-130 unit, streamlining maintenance and operation
of this aging weapon system. At Pope, the synergistic, multi-service
relationship will continue between Army airborne and Air Force airlift forces
with the creation of an active duty/Reserve associate unit. The C-130 unit
remains as an Army tenant on an expanded Fort Bragg. With the disestablishment
of the 43rd Medical Group, the AF will maintain the required manpower to
provide primary care, flight and occupational medicine to support the Air Force
active duty military members. The Army will maintain the required manpower
necessary to provide primary care, flight, and occupational medicine to support
the Army active duty military members. The Army will provide ancillary and
specialty medical services for all assigned Army and Air Force military members
(lab, x-ray, pharmacy, etc).
The
major command’s capacity briefing reported Pittsburgh ARS land constraints
prevented the installation from hosting more than 10 C-130 aircraft and Yeager
AGS cannot support more than eight C-130s. Careful analysis of mission
capability indicates that it is more appropriate to robust the proposed airlift
mission at Fort Bragg to an optimal 16 aircraft C-130 squadron, which provides
greater military value and offers unique opportunities for Jointness.
Payback: The total estimated
one-time cost to the Department of Defense to implement this recommendation is
$218.1M. The net of all costs and savings to the Department during the
implementation period is a savings of $652.5M. Annual recurring savings to the
Department after implementation are $197.0M, with an immediate payback
expected. The net present value of the cost and savings to the Department over
20 years is a savings of $2,515.4M.
Economic
Impact on Communities: Assuming no economic recovery, this recommendation could result in a
maximum potential reduction of 7,840 jobs (4,700 direct jobs and 3,140 indirect
jobs) over the 2006-2011 period in the Fayetteville, NC, Metropolitan
Statistical economic area, which is 4.0 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 246 jobs (156 direct jobs and 90 indirect jobs) over the 2006-2011
period in the Charleston, WV, Metropolitan Statistical economic area, which is
0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 581 jobs (322 direct jobs and 259 indirect jobs) over the
2006-2011 period in the Pittsburgh, PA, Metropolitan Statistical economic area,
which is less than 0.1 percent of economic area employment.
The
aggregate economic impact of all recommended actions on these economic regions
of influence was considered and is at Appendix B of Volume I.
Community
Infrastructure Assessment: A review of the community attributes indicates no issues regarding the
ability of the infrastructure of the communities to support forces, missions
and personnel. There are no known community infrastructure impediments to
implementation of all recommendations affecting the installations in this
recommendation.
Environmental
Impact: There
are potential impacts to air quality; cultural, archeological, or tribal
resources; land use constraints or sensitive resource areas; noise; threatened
and endangered species or critical habitat; waste management; water resources;
and wetlands that may need to be considered during the implementation of this
recommendation. There are no anticipated impacts to dredging; or marine
mammals, resources, or sanctuaries. Impacts of costs include $1.3M in costs for
environmental compliance and waste management. These costs were included in the
payback calculation. There are no anticipated impacts to the costs of
environmental restoration. The aggregate environmental impact of all
recommended BRAC actions affecting the installations in this recommendation
have been reviewed. There are no known environmental impediments to the
implementation of this recommendation.
Hill
Air Force Base, UT, Edwards Air Force Base, CA, Mountain Home Air Force Base, ID, Luke Air
Force Base, AZ, and Nellis Air Force Base, NV
Recommendation:
Realign
Hill Air Force Base, UT. Distribute the 419th Fighter Wing F-16s to the 482d
Fighter Wing, Homestead Air Reserve Base, FL (six aircraft) and the 301st
Fighter Wing, Naval Air Station Joint Reserve Base Fort Worth, TX (nine
aircraft). The AFMC F-16s at Hill will remain in place. Realign Edwards Air
Force Base, CA; Mountain Home Air Force Base, ID; and Luke Air Force Base, AZ, by
relocating base-level LANTIRN intermediate maintenance to Hill, establishing a
Centralized Intermediate Repair Facility (CIRF) for Low Altitude Navigation and
Targeting Infrared for Night (LANTIRN) pods at Hill. Realign Naval Air Station
Joint Reserve Base Fort Worth, TX, and Nellis Air Force Base, NV, by relocating
base-level F110 engine intermediate maintenance to Hill, establishing a CIRF
for F110 engines at Hill.
Justification:
The Air
Force distributed Reserve aircraft to Homestead Air Reserve Base (31) to create
an optimum sized squadron that supports the homeland defense Air Sovereignty
Alert mission. The remaining Reserve aircraft are distributed to the only other
remaining Reserve F- 16 squadron at Naval Air Station Joint Reserve Base Fort
Worth (58). This laydown keeps the active/Air National Guard/ Air Force Reserve
force structure mix constant. Creating CIRFs for LANTIRN pods and F110 engines
establishes Hill as a maintenance workload center for these commodities. This
recommendation compliments other CIRF recommendations as part of an Air Force
effort to standardize stateside and deployed intermediate-level maintenance
concepts, and will increase maintenance productivity and support to the
warfighter.
Payback:
The total
estimated one-time cost to the Department of Defense to implement this
recommendation is $28.2M. The net of all costs and savings to the Department
during the implementation period is a savings of $8.2M. Annual recurring
savings to the Department after implementation are $8.1M with a payback
expected in four years. The net present value of the costs and savings to the
Department over 20 years is a savings of $85.9M.
Economic
Impact on Communities: Assuming no economic recovery, this recommendation could result in a
maximum potential reduction of 245 jobs (121 direct jobs and 124 indirect jobs)
over the 2006-2011 period in the Ogden-Clearfield, UT, Metropolitan Statistical
economic area, which is less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 4 jobs (2 direct jobs and 2 indirect jobs) over the 2006-2011
period in the Bakersfield, CA, Metropolitan Statistical economic area, which is
less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 65 jobs (41 direct jobs and 24indirect jobs) over the 2006-2011
period in the Mountain Home, ID, Metropolitan Statistical economic area, which
is 0.5 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 53 jobs (30 direct jobs and 23 indirect jobs) over the 2006-2011
period in the Phoenix-Scottsdale-Mesa, AZ, Metropolitan Statistical economic
area, which is less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 31 jobs (19 direct jobs and 12 indirect jobs) over the 2006-2011
period in the Las Vegas-Paradise, NV, Metropolitan Statistical economic area,
which is less than 0.1 percent of economic area employment.
The
aggregate economic impact of all recommended actions on these economic regions
of influence was considered and is at Appendix B of Volume I.
Community
Infrastructure Assessment: A review of community attributes indicates there are no issues
regarding the ability of the infrastructure of the communities to support
forces, missions, and personnel. There are no known community infrastructure
impediments to implementation of all recommendations affecting the
installations in this recommendation.
Environmental
Impact: There
are potential impacts to air quality; cultural, archeological, or tribal resources;
land use constraints or sensitive resource areas; noise; threatened and
endangered species or critical habitat; waste management; water resources; and
wetlands that may need to be considered during the implementation of this
recommendation. There are no anticipated impacts to dredging; or marine
mammals, resources, or sanctuaries. Impacts of costs include $1.0M in costs for
environmental compliance and waste management. These costs were included in the
payback calculation. There are no anticipated impacts to the costs of
environmental restoration. The aggregate environmental impact of all
recommended BRAC actions affecting the installations in this recommendation
have been reviewed. There are no known environmental impediments to the
implementation of this recommendation.
Recommendation:
Realign
Luke Air Force Base, AZ, by relocating to Eglin Air Force Base, FL, a
sufficient number of instructor pilots and operations support personnel to
stand up the Air Force’s portion of the Joint Strike Fighter (JSF) Initial
Joint Training Site, hereby established at Eglin Air Force Base, FL. Realign
Marine Corps Air Station Miramar, CA, by relocating to Eglin Air Force Base, FL, a sufficient number of
instructor pilots and operations support personnel to stand up the Marine
Corps’ portion of the JSF Initial Joint Training Site, hereby established at
Eglin Air Force Base, FL. Realign Naval Air Station Oceana, VA, by relocating
to Eglin Air Force Base, FL, a sufficient number of instructor pilots,
operations, and maintenance support personnel to stand up the Navy’s portion of
the JSF Initial Joint Training Site, hereby established at Eglin Air Force
Base, FL. Realign Sheppard Air Force Base, TX, by relocating to Eglin Air Force
Base, FL, a sufficient number of front-line and instructor-qualified
maintenance technicians and logistics support personnel to stand up the Air Force’s
portion of the JSF Initial Joint Training Site, hereby established at Eglin Air
Force Base, FL. Realign Naval Air Station Pensacola, FL, by relocating to Eglin
Air Force Base, FL, a sufficient number of front-line and instructor-qualified
maintenance technicians and logistics support personnel to stand up the
Department of the Navy’s portion of the JSF Initial Joint Training Site hereby
established at Eglin Air Force Base, FL. Section 4: Recommendations – Education and Training
Joint Cross-Service Group E&T – 11
Justification: This recommendation
establishes Eglin Air Force Base, FL as an Initial Joint Training Site that
teaches entry-level aviators and maintenance technicians how to safely operate
and maintain the new Joint Strike Fighter (JSF) (F-35) aircraft. The Department
is scheduled to take delivery of the F-35 beginning in 2008. This joint basing
arrangement will allow the Interservice Training Review Organization (ITRO)
process to establish a DoD baseline program in a consolidated/joint school with
curricula that permit services latitude to preserve service-unique culture and
a faculty and staff that brings a “Train as we fight; jointly” national
perspective to the learning process.
Payback: The total estimated
one-time cost to the Department of Defense to implement this recommendation is
$199.1M. The net of all costs and savings to the Department during the
implementation period is a cost of $209.6M. Annual recurring costs to the
Department after implementation are $3.3M with no payback expected. The net
present value of the costs and savings to the Department over 20 years is a
cost of $226.3M.
Economic
Impact on Communities: Assuming no economic recovery, this recommendation could result in a
maximum potential reduction of 888 jobs (392 direct jobs and 496 indirect jobs)
over 2008-2011 in the Pensacola-Ferry, Pass-Brent, FL, Metropolitan Statistical
Area, which is 0.4 percent of economic area employment. Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
85 jobs (48 direct jobs and 37 indirect jobs) over 2006-2011 in the
Phoenix-Mesa-Scottsdale, AZ, Metropolitan Statistical Area, which is less than
0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 82 jobs (43 direct jobs and 39 indirect jobs) over 2006-2011 in
the San Diego- Carlsbad-San Marcos, CA, Metropolitan Statistical Area, which is
less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 69 jobs (33 direct jobs and 36 indirect jobs) over 2006-2011 in
the Virginia Beach- Norfolk-Newport News, VA-NC, Metropolitan Statistical Area,
which is less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 487 jobs (295 direct jobs and 192 indirect jobs) over 2006-2011 in
the Wichita Falls, TX, Metropolitan Statistical Area, which is 0.5 percent of
economic area employment. The aggregate economic impact of all recommended
actions on these economic regions of influence was considered.
Community
Infrastructure Assessment: A review of community attributes indicates no issues regarding the
ability of the infrastructure of the communities to support missions, forces,
and personnel. There are no known community infrastructure impediments to
implementation of all recommendations affecting the installations in this
recommendation.
Environmental
Impact:
This recommendation may require a significant air permit revision for Eglin Air
Force Base. Additional operations at Eglin Air Force Base could impact
cultural, archeological, or historic sites, which would then impact operations.
DoD will need to reevaluate Eglin Air Force Base noise contours as a result of
the change in mission. This recommendation will require Endangered Species Act
Consultation for all T&E species at Eglin. This recommendation may require
modifying the hazardous waste program and on-installation water treatment works
permits. Additional operations may impact wetlands at Eglin. This
recommendation has no impact on dredging; land use constraints or sensitive
resource areas; marine mammals, resources, or sanctuaries; or water resources.
This recommendation will require approximately $1.0M for waste management and
environmental compliance activities. This cost was included in the payback
calculation. This recommendation does not otherwise impact the cost of
environmental restoration, waste management, or environmental compliance
activities. The aggregate environmental impact of all recommended BRAC actions
affecting the bases in this recommendation has been reviewed. There are no
known environmental impediments to implementation of this recommendation.
Consolidate Civilian Personnel Offices (CPOs) within each Military Department and the Defense Agencies
Recommendation: Realign Fort Richardson, AK,
by relocating the Civilian Personnel Operations Center to Fort Huachuca, AZ,
and consolidating it with the Civilian Personnel Operations Center at Fort
Huachuca, AZ. Realign Rock Island Arsenal, IL, by relocating the Civilian
Personnel Operations Center to Fort Riley, KS, and Aberdeen Proving Ground, MD,
and consolidating with the Civilian Personnel Operations Center at Fort Riley,
KS, and Aberdeen Proving Ground, MD.
Realign Human Resource
Service Center-Northeast, 111 S. Independence Mall, East, Bourse Bldg, a leased
installation in Philadelphia, PA, by relocating the Civilian Personnel Office
to the Naval Support Activity Philadelphia, PA. Realign Human Resource Service
Center-Southeast, 9110 Leonard Kimble Road, a leased installation at Stennis
Space Center, MS, by relocating the Civilian Personnel Office to the Naval
Support Activity Philadelphia, PA, and consolidating it with the relocated
Human Resource Service Center-Northeast at the Naval Support Activity,
Philadelphia, PA. Realign Human Resource Service Center-Southwest, 525 B Street, Suite 600, a leased installation in San Diego, CA, by
relocating the Civilian Personnel Office to Naval Air Station North Island or
Marine Corps Air Station Miramar, CA. Realign Human Resource Service Center-Pacific, 178 Main Street,
Bldg 499, Honolulu, HI, by relocating the Civilian Personnel Office to the
Human Resource Service Center-Northwest, 3230 NW Randall Way, Silverdale, WA,
and Naval Air Station North Island or Marine Corps Air Station Miramar, CA and
consolidating with the Human Resource Service Centers at Silverdale, WA and
Naval Air Station North Island or Marine Corps Air Station Miramar, CA.
Realign Wright-Patterson Air
Force Base, OH, by relocating the Civilian Personnel Office to Randolph Air
Force Base, TX. Realign Robins Air Force Base, GA, by relocating the Civilian
Personnel Office to Randolph Air Force Base, TX. Realign Hill Air Force Base,
UT, by relocating the Civilian Personnel Office to Randolph Air Force Base, TX.
Realign Tinker Air Force Base, OK, by relocating the Civilian Personnel Office
to Randolph Air Force Base, TX. Realign Bolling Air Force Base, DC, by
relocating the Civilian Personnel Office to Randolph Air Force Base, TX.
Consolidate the relocated civilian personnel offices with the Civilian
Personnel Office at Randolph Air Force Base, TX.
Realign 2521 Jefferson Davis
Hwy, a leased installation in Arlington, VA, by relocating the transactional
functions of the Defense Commissary Agency Human Resource Division and the
Washington Headquarters Services Civilian Personnel Office to the Defense
Logistics Agency, 3990 East Broad Street, Columbus, OH, and consolidating them
with the Customer Support Office of the Defense Logistics Agency. Realign the
Department of Defense Education Activity, 4040 North Fairfax Drive, a leased
installation in Arlington, VA, by relocating the transactional functions of the
Civilian Personnel Office to the Defense Logistics Agency 3990 East Broad
Street, Columbus, OH, and consolidating them with the Customer Support Office
of the Defense Logistics Agency. Realign the Defense Information Systems
Agency, 701 S. Courthouse Road, Arlington, VA, by relocating the transactional
functions of the Civilian Personnel Office to the Defense Finance and
Accounting Service, 8899 E. 56th Street,
Indianapolis, IN, and consolidating them with the Civilian Personnel Office of
the Defense Finance and Accounting Service at Indianapolis, IN.
Justification: The consolidation of
Civilian Personnel Offices within each Military Department and the
transactional functions among the Defense Agencies reduces excess capacity,
reduces the use of leased facilities, and achieves manpower savings through
consolidation and elimination of duplicate functions. This recommendation
supports the Administration’s urging of federal agencies to consolidate
personnel services. During the implementation of this recommendation it is
important to partner with the National Security Personnel System (NSPS). NSPS
provides the opportunity to improve the effectiveness of the Department through
a simplified personnel management system that will improve the way it hires and
assigns employees. This recommendation will be an effective tool for NSPS and
provide the flexibility and responsiveness that supports the implementation of
this system. Since NSPS will define a new human resource system featuring
streamlined hiring, simplified job changes, and a less complex classification
system, it covers all functions that would be supported by Civilian Personnel
Offices.
Payback: The total estimated one-time
cost to the Department of Defense to implement this recommendation is $97.5M.
The net of all costs and savings to the Department of Defense during the
implementation period is a cost of $46.4M. Annual recurring savings to the
Department after implementation are $24.4M with a payback expected in four
years. The net present value of the costs and savings to the Department over 20
years is a savings of $196.7M.
Economic Impact on
Communities: Assuming
no economic recovery, this recommendation could result in maximum potential job
reductions (direct and indirect) over the 2006-2011 period in the respective
economic areas as listed in the table below:
Region of Influence Total
Job Reductions Direct Job Reductions Indirect Job Reductions % of Economic Area
Employment Anchorage,
AK Metropolitan Statistical Area 118 62 56 Less Than 0.1 Davenport-Moline-Rock
Island, IA – IL Metropolitan Statistical Area 471 251 220 0.2 Dayton, OH
Metropolitan Statistical Area 235 127 108 Less Than 0.1 Gulfport-Biloxi, MS
Metropolitan Statistical Area 280 148 132 0.2 Honolulu, HI Metropolitan
Statistical Area 136 68 68 Less Than 0.1 Ogden-Clearfield, UT Metropolitan Statistical
Area 168 85 83 Less Than 0.1 Oklahoma City, OK Metropolitan Statistical Area
252 111 141 Less Than 0.1 Warner Robins, GA Metropolitan Statistical Area 155
95 60 0.2 Washington-Arlington- Alexandria, DC-VAMD- WV Metropolitan Division
643 366 277 Less Than 0.1 The aggregate economic impact of all recommended
actions on these economic regions of influence was considered and is at
Appendix B of Volume I.
Community Infrastructure
Assessment: A
review of community attributes indicates: Fort Riley has a lack of graduate and
PhD programs, Median House Values below the US average, a low number of vacant
rental and sale units, and a higher than average Population per Physician
ratio; Aberdeen Proving Ground is 46 miles to the nearest airport; Randolph Air
Force Base has Median House Values below the US Average and a Crime Rate Index
65 percent higher than the National average; DFAS Indianapolis is located more
than 25 miles from the nearest airport; and DSC Columbus has a Uniform Crime
Reports (UCR) Index higher than the national average. These issues do not
affect the ability of the infrastructure of the communities to support
missions, forces, and personnel. There are no known community infrastructure
impediments to implementation of all recommendations affecting the
installations in this recommendation.
Environmental Impact: New Source Review permitting
and air conformity analyses may be required at Aberdeen, NSA Philadelphia, NAS
North Island, and MCAS Miramar. Additional operations at Randolph may impact threatened and
endangered species and/or critical habitats. Significant mitigation measures to
limit releases may be required at Aberdeen to reduce impacts to water quality
and achieve US EPA water quality standards. Increased missions may result in
additional water restrictions or mitigation requirements at Fort Huachuca.
Minimal impact expected. This recommendation has no impact on cultural,
archeological, or tribal resources; dredging; land use constraints or sensitive
resource areas; marine mammals, resources, or sanctuaries; noise; waste
management; or wetlands. This recommendation will require spending
approximately $0.2M for waste management and environmental compliance
activities. This cost was included in the payback calculation. This
recommendation does not otherwise impact the costs of environmental
restoration, waste management, or environmental compliance activities. The
aggregate environmental impact of all recommended BRAC actions affecting the
bases in this recommendation has been reviewed. There are no known
environmental impediments to implementation of this recommendation.
Recommendation:Realign Edwards Air Force
Base, CA, Kirtland Air Force Base, NM, and Marine Corps Base Camp Pendleton, CA, by relocating the correctional function of each to Marine Corps
Air Station, Miramar, CA, and consolidating them with the correctional function already at
Marine Corps Air Station Miramar, CA, to form a single Level II Southwest Joint Regional Correctional
Facility.
Realign
Lackland Air Force Base, TX, Fort Knox, KY, and Fort Sill, OK by relocating the
correctional function of each to Fort Leavenworth, KS, and consolidating them
with the correctional function already at Fort Leavenworth, KS, to form a
single Level II Midwest Joint Regional Correctional Facility.
Realign
Naval Air Station Jacksonville, FL, and Naval Air Station Pensacola, FL, by
relocating the correctional function of each to Naval Weapons Station
Charleston, SC, and consolidating them with the correctional function already
at Naval Weapons Station Charleston, SC, to form a single Level II Southeastern
Joint Regional Correctional Facility.
Realign
Naval Support Activity Norfolk, VA, Marine Corps Base Quantico, VA, and Camp
LeJeune, NC, by relocating the correctional function of each and consolidating
them at Naval Support Activity, Northwest Annex, Chesapeake, VA, to form a
single Level II Mid-Atlantic Joint Regional Correctional Facility.
Realign
Fort Lewis, WA, by relocating the management of correctional functions to
Submarine Base Bangor, WA. The correctional facilities at Submarine Base
Bangor, WA, and Fort Lewis, WA, will together form the Level II Northwestern
Joint Regional Correctional Facility.
Justification:
The
Department of Defense (DoD) Correctional program exists to enforce the military
justice system, ensuring the safety, security, administration, and good order
and discipline of its prisoners under guidance of the Uniform Code of Military
Justice (UCMJ). The UCMJ is legislation that is contained in Title 10 of the
United States Code. It comprises a complete set of criminal military law and
code. The DoD Correctional program currently consists of 17 DoD correctional
facilities, which incorporate three facility classifications and four custody
levels. There are eight Level I, eight Level II and one Level III correctional
facilities. Level I is capable of providing pretrial and post-trial confinement
up to 1-year. Level II is capable of providing pretrial and post-trial
confinement for prisoners/inmates with sentences to confinement of five years
or less and Level III provides post-trial confinement exceeding five years, one
day, to include life and death sentences.
This
recommendation creates five, Level II Joint Regional Correctional Facilities.
The Southwest Joint Regional Correctional Facility consolidates the Naval
Consolidated Brig Miramar, Marine Corps Air Station Miramar; the Edwards Confinement Facility, Edwards Air Force Base, CA; the Kirtland Confinement Facility, Kirtland Air Force Base, NM;
and the Marine Corps Base Brig, Camp Pendleton Camp Pendleton to a single
Level II Joint Regional Correctional Facility at Miramar. The Midwestern Joint
Regional Correctional Facility consolidates the Lackland Confinement Facility,
Lackland Air Force Base, TX; the Army Regional Correctional Facility, Fort
Knox, KY; the Army Regional Correctional Facility, Fort Sill, OK, and the
components of the US Disciplinary Barracks at Fort Leavenworth, KS, into a
single Level II Joint Regional Correctional Facility at Leavenworth. The
Southeastern Joint Regional Correctional Facility consolidates the Naval
Consolidated Brig Charleston, Naval Weapons Station, Charleston, SC; the
Waterfront Brig Jacksonville, Naval Air Station Jacksonville, FL; and the
Waterfront Brig Pensacola, Naval Air Station Pensacola, FL, to a single Level
II Joint Regional Correctional Facility at Charleston. The Mid-Atlantic Joint
Regional Correctional Facility consolidates the Naval Brig Norfolk, Naval
Support Activity, Norfolk, VA; Marine Corps Base Brig, Quantico, VA; and Marine
Corps Base Brig Camp LeJeune, NC; to a single Level II Joint Regional
Correctional Facility at Chesapeake. The Northwestern Joint Regional
Correctional Facility consolidates the Army Regional Correctional Facility at
Fort Lewis, WA and the Waterfront Brig Puget Sound, Silverdale, Submarine Base
Bangor, WA, to a single Level II Joint Regional Correctional Facility with
correctional facilities at both locations.
This
realignment and consolidation facilitates the creation of a Joint DoD
Correctional system, improves jointness, reduces footprint, centralizes joint
corrections training; builds new facilities which will provide significant
improvements in terms of safety, security, efficiency and costs. Within this
construct, policies and operations become standardized, facilities modernized,
ultimately reducing manpower and decreasing operational costs through economies
of scale. The construction of new facilities provides the opportunity to
eliminate or dramatically reduce operational and maintenance costs of older
inefficient facilities in addition to facilitating accreditation by the
American Corrections Association (ACA). Additionally, reengineering efforts may
provide an opportunity to eliminate redundancy in treatment programs, create a
DoD versus military service specific Clemency and Parole Board and a Joint
Enterprise for common functions; benefits not capture through the Cost of Base
Realignment and Closure Actions (COBRA). This recommendation is designed to
confine inmates/prisoners based on sentence length, geographical location and
rehabilitation/treatment programs. The skills and expertise developed by
military correctional specialists and personnel in operating confinement
facilities are critical in operating detention camps (enemy prisoners of war)
during the current global war on terrorism and future military conflicts.
Payback:
The total
estimated one-time cost to the Department of Defense to implement this
recommendation is $178.8M. The net of all costs and savings to the Department
of Defense during the implementation period is a cost of $149.4M. Annual
recurring savings to the Department of Defense after implementation are $14.6M
with a payback expected in 16 years. The net present value of the costs and
savings to the Department of Defense over 20 years is a savings of $2.3M.
Economic
Impact on Communities: Assuming no economic recovery, this recommendation could result in a
maximum potential reduction of 23 jobs (12 direct and 11 indirect jobs) over
the 2006-2011 periods in the Bakersfield, CA Metropolitan Statistical Area,
which is less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 22 jobs (12 direct and 10 indirect jobs) over the 2006-2011
periods in the Albuquerque, NM Metropolitan Statistical Area, which is less
than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 122 jobs (64 direct and 58 indirect jobs) over the 2006-2011
periods in the San Diego-Carlsbad-San Marcos, CA Metropolitan Statistical Area,
which is less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 2 jobs (1 direct and 1 indirect job) over the 2006-2011 periods in
the Bremerton- Silverdale, WA Metropolitan Statistical Area, which is less than
0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 17 jobs (9 direct and 8 indirect jobs) over the 2006-2011 periods
in the San Antonio, TX Metropolitan Statistical Area, which is less than 0.1
percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 204 jobs (123 direct and 81 indirect jobs) over the 2006-2011
periods in the Lawton, OK Metropolitan Statistical Area, which is 0.3 percent
of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential reduction
of 169 jobs (105 direct and 64 indirect jobs) over the 2006-2011 periods in the
Elizabethtown, KY Metropolitan Statistical Area, which is 0.3 percent of
economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 78 jobs (36 direct and 42 indirect jobs) over the 2006-2011
periods in the Jacksonville, FL Metropolitan Statistical Area, which is less
than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 74 jobs (30 direct and 44 indirect jobs) over the 2006-2011
periods in the Pensacola- Ferry Pass-Brent, FL Metropolitan Statistical Area,
which is less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 91 jobs (56 direct and 35 indirect jobs) over the 2006-2011
periods in the Washington-Arlington-Alexandria, District of Columbia-VA-MD-West
VA Metropolitan Statistical Area, which is less than 0.1 percent of economic
area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 326 jobs (207 direct and 119 indirect jobs) over the 2006-2011
periods in the Jacksonville, NC Metropolitan Statistical Area, which is 0.4
percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 6 jobs (3 direct and 3 indirect jobs) over the 2006-2011 periods
in the Tacoma, WA Metropolitan Statistical Area, which is less than 0.1 percent
of economic area employment.
The
aggregate economic impact of all recommended actions on these economic regions
of influence was considered and is at Appendix B of Volume I.
Community
Infrastructure Assessment: A review of community attributes indicates no issues regarding the
ability of the infrastructure of the communities to support missions, forces,
and personnel. There are no known community infrastructure impediments to
implementation of all recommendations affecting the installations in this
recommendation.
Environmental
Impact: This
recommendation may impact air quality and will require New Source Review and
conformity analyses. This recommendation may impact cultural, archeological or
tribal resources. Tribal negotiations may be required to expand use (or
construction) near listed areas. Threatened and endangered species or critical
habitat may be impacted at Fort Lewis and Marine Corps Air Station Miramar depending on the site of new
military construction. Solid waste change orders are necessary at Naval Support
Activity Northwest Annex to accommodate the new mission. New construction at
Naval Support Activity Northwest Annex may impact wetlands. This recommendation
has no impact on dredging; land use constraints or sensitive resource areas;
marine mammals, resources, or sanctuaries; noise; or water resources. This
recommendation will require spending approximately $0.4M for waste management
and environmental compliance activities. This cost was included in the payback
calculation. This recommendation does not otherwise impact the costs of the
environmental restoration, waste management, or environmental compliance
activities. The aggregate environmental impact of all recommended BRAC actions
affecting the bases in this recommendation has been reviewed. There are no
known environmental impediments to implementation of this recommendation.
Defense
Finance and Accounting Service Recommendation: Close the Defense Finance
and Accounting Service (DFAS) sites at Rock Island IL; Pensacola Saufley Field,
FL; Norfolk Naval Station, VA; Lawton, OK; Pensacola Naval Air Station, FL;
Omaha, NE; Dayton, OH; St. Louis, MO; San Antonio, TX; San Diego, CA; Pacific Ford Island,
HI; Patuxent River, MD; Limestone, ME; Charleston, SC; Orlando, FL; Rome, NY;
Lexington, KY; Kansas City, MO; Seaside, CA; San Bernardino, CA; and Oakland, CA. Relocate and consolidate business, corporate and administrative
functions to the Defense Supply Center-Columbus, OH, the Buckley Air Force Base
Annex, Denver, CO, or the MG Emmett J. Bean Federal Center, Indianapolis, IN.
Realign
DFAS Arlington, VA, by relocating and consolidating business, corporate, and
administrative functions to the Defense Supply Center-Columbus, OH, the Buckley
Air Force Base Annex, Denver, CO, or the MG Emmett J. Bean Federal Center,
Indianapolis, IN. Retain a minimum essential DFAS liaison staff to support the
Under Secretary of Defense (Comptroller)/Chief Financial Officer, Military
Service Chief Financial Officers, and Congressional requirements.
Realign
DFAS Cleveland, OH, by relocating and consolidating business, corporate, and
administrative functions to the Defense Supply Center-Columbus, OH, the Buckley
Air Force Base Annex, Denver, CO, or the MG Emmett J. Bean Federal Center,
Indianapolis, IN. Retain an enclave for the Military Retired and Annuitant Pay
Services contract function and government oversight.
Realign
DFAS Columbus, OH, by relocating up to 55 percent of the Accounting Operation
functions and associated corporate and administrative functions to DFAS Denver,
CO, or DFAS Indianapolis, IN, and up to 30 percent of the Commercial Pay
function and associated corporate and administrative functions to DFAS
Indianapolis, IN, for strategic redundancy. Realign DFAS Denver, CO, by
relocating up to 25 percent of the Accounting Operation functions and
associated corporate and administrative functions to DFAS Columbus, OH, or
DFAS
Indianapolis, IN, and up to 35 percent of the Military Pay function and
associated corporate and administrative functions to DFAS Indianapolis, IN, for
strategic redundancy. Realign DFAS Indianapolis, IN, by relocating up to 10
percent of the Accounting Operation functions and associated corporate and
administrative functions to DFAS Columbus, OH or DFAS Denver, CO, and up to 20
percent of the Commercial Pay function and associated corporate and
administrative functions to DFAS Columbus, OH, for strategic redundancy.
Justification:
This action
accomplishes a major facilities reduction and business line mission
realignment, transforming the current DFAS organization into an optimum
facilities configuration, which includes strategic redundancy to minimize risks
associated with man-made or natural disasters/challenges. All three of the
gaining sites meet DoD Antiterrorism/Force Protection (AT/FP) Standards. The
current number of business line operating locations (26) inhibits the ability
of DFAS to reduce unnecessary redundancy and leverage benefits from economies
of scale and synergistic efficiencies. Overall excess facility capacity
includes approximately 43 percent or 1,776,000 Gross Square Feet (GSF) in
administrative space and 69 percent or 526,000 GSF in warehouse space with many
locations lacking adequate threat protection as defined in DoD AT/FP Standards.
Finally, the three locations have potential to evolve into separate Business
Line Centers of Excellence and further enhance “unit cost” reductions beyond
the BRAC facilities/personnel savings aspect.
The
three gaining locations were identified through a process that used Capacity
Analysis, Military Value, Optimization Modeling, and knowledge of the DFAS organization,
and business line mission functions. The Military Value analysis, of 26
business operating locations, ranked the Buckley AF Base Annex, CO, the Defense
Supply Center-Columbus, OH, and the MG Emmett J. Bean Federal Center,
Indianapolis, IN, as 3, 7, and 9 respectively. The Optimization analysis not
only included the factors of available capacity and expansion capability, but
also included business line process and business operational considerations in
identifying the three-location combination as providing the optimal facilities
approach to hosting DFAS business line missions/functions.
Subject
matter knowledge of DFAS’s three business line missions and its operational
components, along with business process review considerations and scenario
basing strategy, was used to focus reduction of the 26 locations and
identification of the three gaining locations. The scenario basing strategy
included reducing the number of locations to the maximum extent possible, while
balancing the requirements for an environment meeting DoD Antiterrorist and
Force Protection standards, strategic business line redundancy, area workforce
availability, and to include an anchor entity for each business line and thus
retain necessary organizational integrity to support DoD customer needs while
the DFAS organization relocation is executed.
Payback:
The total
estimated one-time cost to the Department of Defense to implement this
recommendation is $282.1M. The net of all costs and savings to the Department
during the implementation period (FY06-FY11) is a savings of $158.1M. Annual
recurring savings to the Department after implementation are $120.5M, with an
immediate payback expected. The Net Present Value of the costs and savings to
the Department over 20 years is a savings of $1,313.8M.
Community
Infrastructure Assessment: A review of community attributes indicates no issues regarding the
ability of the infrastructure of the communities to support missions, forces,
and personnel. There are no known community infrastructure impediments to
implementation of all recommendations affecting the installations in this
recommendation.
Environmental
Impact: This
recommendation has no impact on air quality; cultural, archeological, or tribal
resources; dredging; land use constraints or sensitive resource areas; marine
mammals, resources, or sanctuaries; noises; threatened and endangered species
or critical habitat; waste management; or wetlands. An air conformity analysis
may be needed at Buckley AF Base Annex. This recommendation will require
spending approximately $0.01M for environmental compliance activities. This
cost was included in the payback calculation. This recommendation does not
otherwise impact the costs of environmental restoration, waste management, and
environmental compliance activities. The aggregate environmental impact of all
recommended BRAC actions affecting the bases in this recommendation has been
reviewed. There are no known environmental impediments to implementation of
this recommendation.
Riverbank
Army Ammunition Plant, CA
Recommendation: Close Riverbank Army
Ammunition Plant, CA. Relocate the artillery cartridge case metal parts functions to
Rock Island Arsenal, IL.
Justification:
There are 4
sites within the Industrial Base producing Metal Parts. To remove excess from
the Industrial Base, the closure allows DoD to generate efficiencies and
nurture partnership with multiple sources in the private sector.
Payback:
The total
estimated one-time cost to the Department of Defense to implement this
recommendation is $25.2M. The net of all costs and savings to the Department
during the implementation period is a cost of $10.4M. Annual recurring savings
to the Department after implementation are $6.5M with a payback expected within
3 years. The net present value of the costs and savings to the Department over
20 years is a savings of $53.3M.
Economic
Impact on Communities: Assuming no economic recovery, this recommendation could result in a
maximum potential reduction of 106 jobs (89 direct jobs and 17 indirect jobs)
over the 2006 – 2011 period in the Modesto, CA Metropolitan Statistical Area,
which is less than 0.1 percent of economic area employment. The aggregate
economic impact of all recommended actions on this economic region of influence
was considered and is at Appendix B of Volume I.
Community
Infrastructure Assessment: A review of community attributes indicates no issues regarding the
ability of the infrastructure of the community to support missions, forces, and
personnel. There are no known community infrastructure impediments to
implementation of all recommendations affecting the installations in this
recommendation. Environmental Impact: This recommendation has the
potential to impact air quality at Rock Island Arsenal. A new Source Review
will be needed for new construction and the added operations will require an
Air Conformity analysis to determine the impact. Continued management and/or
deed restrictions at Riverbank Army Ammunition Plant will be necessary to ensure
future protection of federally listed species. Restoration, monitoring/sweeps,
access controls, and/or deed restrictions may be required at Riverbank Army
Ammunition Plant to prevent disturbance, health and safety risks, and/or
long-term release of toxins to environmental media. Riverbank Army Ammunition
Plant also has a domestic wastewater treatment facility that may require
cleanup. This recommendation has the potential for a minor impact on water
resources at Rock Island Arsenal. This recommendation has no impact on
cultural, archeological, or tribal resources; dredging; marine mammals,
resources, or sanctuaries; noise; or wetlands. This recommendation will require
spending approximately $2.5M for environmental compliance activities. This cost
was included in the payback calculation. Riverbank Army Ammunition Plant
reports approximately $10.5M in environmental restoration costs. Because the
Department of Defense has a legal obligation to perform environmental
restoration regardless of whether an installation is closed, realigned, or
remains open, this cost was not included in the payback calculation. This
recommendation does not otherwise impact the costs of environmental
restoration, waste management, and environmental compliance activities. The
aggregate environmental impact of all recommended BRAC actions affecting the
bases in this recommendation has been reviewed. There are no known
environmental impediments to implementation of this recommendation.
Recommendation:
Realign
Sierra Army Depot, CA. Relocate Storage to Tooele Army Depot, NV and Demilitarization
to Crane Army Ammunition Activity, IN, and McAlester Army Ammunition Plant, OK.
Justification:
Capacity
and capability for storage exists at numerous munitions sites. To reduce
redundancy and remove excess from the Industrial Base, the realignment allows
DoD to create centers of excellence and remove inefficiencies.
Payback:
The total
estimated one-time cost to the Department of Defense to implement this
recommendation is $33.4M. The net of all costs and savings to the Department
during the implementation period is a cost of $7.2M. Annual recurring savings
to the Department after implementation are $7.5M with a payback expected within
7 years. The net present value of the costs and savings to the Department over
20 years is a savings of $66.7M.
Economic
Impact on Communities: Assuming no economic recovery, this recommendation could result in a
maximum potential reduction of 17 jobs (12 direct jobs and 5 indirect jobs)
over the period 2006-2011 in the Susanville, CA Micropolitan Statistical Area,
which is 0.1 percent of the economic area employment. The aggregate economic
impact of all recommended actions on this economic region of influence was
considered and is at Appendix B of Volume I.
Community
Infrastructure Assessment: A review of community attributes indicates no issues regarding the
ability of the infrastructure of the communities to support missions, forces,
and personnel. There are no known community infrastructure impediments to
implementation of all recommendations affecting the installations in this
recommendation.
Environmental
Impact: This
recommendation has no impact on air quality; cultural, archeological, or tribal
resources; dredging; land use constraints or sensitive resource areas; marine
mammals, resources, or sanctuaries; noise; threatened and endangered species or
critical habitat; waste management; water resources; or wetlands. This
recommendation will require spending approximately $0.3M for environmental
compliance activities. This cost was included in the payback calculation. This
recommendation does otherwise not impact the costs of environmental
restoration, waste management, and other environmental compliance activities.
The aggregate environmental impact of all recommended BRAC actions affecting
the bases in this recommendation has been reviewed. There are no known
environmental impediments to implementation of this recommendation.
Recommendation:
Realign
Naval Air Station Oceana, VA, by disestablishing the Aircraft Intermediate Maintenance
Department Oceana, the Naval Air Depot Cherry Point Detachment, and the Naval
Air Depot Jacksonville Detachment; establishing Fleet Readiness Center Mid
Atlantic, Naval Air Station Oceana, VA; and transferring all intermediate
maintenance workload and capacity to Fleet Readiness Center Mid Atlantic, Naval
Air Station Oceana, VA. Realign Naval Air Station Patuxent River, MD, by
disestablishing the Aircraft Intermediate Maintenance Department at Naval Air
Warfare Center Aircraft Division; establishing Fleet Readiness Center Mid
Atlantic Site Patuxent River, Naval Air Station Patuxent River, MD; and
transferring all intermediate maintenance workload and capacity to Fleet
Readiness Center Mid Atlantic Site Patuxent River, Naval Air Station Patuxent River,
MD. Realign Naval Air Station Norfolk, VA, by disestablishing the Aircraft
Intermediate Maintenance Department Norfolk VA, the Naval Air Depot
Jacksonville Detachment, and Naval Air Warfare Center Aircraft Division
Lakehurst Detachment; establishing Fleet Readiness Center Mid Atlantic Site
Norfolk, Naval Air Station Norfolk, VA; and transferring all intermediate and
depot maintenance workload and capacity to Fleet Readiness Center Mid Atlantic
Site Norfolk, Naval Air Station Norfolk, VA.
Realign
Naval Air Station Joint Reserve Base New Orleans, LA, by disestablishing the
Aircraft Intermediate Maintenance Department, establishing Fleet Readiness
Center Mid Atlantic Site New Orleans, Naval Air Station Joint Reserve Base New
Orleans, LA; and transfer all intermediate maintenance workload and capacity to
Fleet Readiness Center Mid Atlantic Site New Orleans, Naval Air Station Joint
Reserve Base New Orleans, LA.
Realign
Marine Corps Air Station Cherry Point, NC, as follows: disestablish Naval Air
Depot Cherry Point; establish Fleet Readiness Center East, Marine Corps Air
Station Cherry Point, NC; relocate depot maintenance workload and capacity for
Aircraft Avionics/Electronics Components (approximately 39 K DLHs), Aircraft
Hydraulic Components (approximately 69 K DLHs), Aircraft Landing Gear
Components (approximately 8 K DLHs), Aircraft Other Components (approximately
23 K DLHs), and Aircraft Structural Components (approximately 126 K DLHs) to
Fleet Readiness Center Mid Atlantic, Naval Air Station Oceana, VA; relocate
depot maintenance workload and capacity for Aircraft Avionics/Electronics
Components (approximately 11 K DLHs), Aircraft Hydraulic Components
(approximately 19 K DLHs), Aircraft Landing Gear Components (approximately 2 K
DLHs), Aircraft Structural Components (approximately 35 K DLHs), and Aircraft
Other Components (approximately 6 K DLHs) to Fleet Readiness Center Mid
Atlantic Site Norfolk, Naval Air Station Norfolk, VA; relocate depot
maintenance workload and capacity for Aircraft Avionics/Electronics Components
(approximately 6 K DLHs), Aircraft Hydraulic Components (approximately 10 K
DLHs), Aircraft Landing Gear Components (approximately 1 K DLHs), Aircraft
Other Components (approximately 3 K DLHs), and Aircraft Structural Components
(approximately 18 K DLHs) to Fleet Readiness Center Mid Atlantic Site Patuxent
River, Naval Air Station Patuxent River, MD; relocate depot maintenance
workload and capacity for Aircraft Avionics/Electronics Components
(approximately 2 K DLHs), Aircraft Hydraulic Components (approximately 3 K
DLHs), Aircraft Landing Gear Components (approximately 0.4K DLHs), Aircraft
Other Components (approximately 1 K DLHs), and Aircraft Structural Components
(approximately 6 K DLHs) to FRC Mid Atlantic Site New Orleans, Naval Air
Station JRB New Orleans, LA.; relocate depot maintenance workload and capacity
for Aircraft Avionics/Electronics Components (approximately 9 K DLHs), Aircraft
Hydraulic Components (approximately 16 K DLHs), Aircraft Landing Gear
Components (approximately 2 K DLHs), Aircraft Other Components (approximately 6
K DLHs) and Aircraft Structural Components (approximately 30 K DLHs) to the
Fleet Readiness Center East Site Beaufort, hereby established at Marine Corps
Air Station Beaufort, SC; relocate depot maintenance workload and capacity for
Aircraft Avionics/Electronics Components (approximately 11 K DLHs), Aircraft
Hydraulic Components (approximately 20
K DLHs), Aircraft Landing Gear Components (approximately 2 K DLHs), Aircraft
Other Components (approximately 6 K DLHs), Aircraft Structural Components
(approximately 36 K DLHs), Aircraft Rotary (approximately 1 K DLHs), Aircraft
VSTOL (approximately 2 K DLHs), Aircraft Cargo/Tanker (approximately 0.02K
DLHs,), Aircraft Other (approximately 18 K DLHs), Aircraft Structural
Components (approximately 0.001K DLHs), Calibration (approximately 0.15 K DLHs)
and "Other" Commodity (approximately 0.3 K DLHs) to Fleet Readiness
Center East Site New River, hereby established at Marine Corps Air Station New
River, Camp Lejeune, NC; and transfer all remaining depot maintenance workload
and capacity to Fleet Readiness Center East, Marine Corps Air Station Cherry
Point, NC.
Realign
Marine Corps Air Station Beaufort, SC, by disestablishing Naval Air Depot
Jacksonville Detachment Beaufort and transferring all depot maintenance
workload and capacity to Fleet Readiness Center East Site Beaufort, Marine
Corps Air Station Beaufort, SC.
Realign
Naval Air Station Jacksonville, FL, as follows: disestablish Naval Air Depot
Jacksonville, Naval Air Depot Jacksonville Detachment Jacksonville, and
Aircraft Intermediate Maintenance Department Jacksonville; establish Fleet
Readiness Center Southeast, Naval Air Station, Jacksonville, FL; relocate depot
maintenance workload and capacity for Aircraft Avionics/Electronics Components
(approximately 8 K DLHs), Aircraft Hydraulic Components (approximately 6 K
DLHs), Aircraft Landing Gear Components (approximately 3 K DLHs), Aircraft
Other Components (approximately 27 K DLHs), and Aircraft Structural Components
(approximately 9 K DLHs) to Fleet Readiness Center Southeast Site Mayport,
hereby established at Naval Air Station, Mayport, FL; transfer all remaining
intermediate and depot maintenance workload and capacity to Fleet Readiness
Center Southeast, Naval Air Station Jacksonville, FL.
Realign
Naval Air Station Mayport, FL, by disestablishing Aircraft Intermediate
Maintenance Department, Naval Air Depot Jacksonville Detachment Mayport, and
Naval Air Warfare Center Aircraft Division Lakehurst Voyage Repair Team
Detachment Mayport and transferring all intermediate maintenance workload and
capacity to Fleet Readiness Center Southeast Site Mayport, Naval Air Station
Mayport, FL.
Realign
Naval Air Station Lemoore, CA, by disestablishing Aircraft Intermediate Maintenance Department
Lemoore and Naval Air Depot North Island Detachment; establishing Fleet
Readiness Center West, Naval Air Station Lemoore, CA; and transferring all
intermediate and depot maintenance workload and capacity to Fleet Readiness
Center West, Naval Air Station Lemoore, CA.
Realign
Naval Air Station Fallon, NV, by disestablishing the Aircraft Intermediate
Maintenance Department Fallon and the Naval Air Depot North Island Detachment
Fallon; establishing Fleet Readiness Center West Site Fallon, Naval Air Station
Fallon, NV; and transferring all intermediate and depot maintenance workload
and capacity to Fleet Readiness Center West Site Fallon, Naval Air Station
Fallon, NV.
Realign
Naval Air Warfare Center Weapons Division China Lake, CA, by disestablishing the Aircraft Intermediate Maintenance
Department and relocating its maintenance workload and capacity for Aircraft (approximately
3 K DLHs), Aircraft Components (approximately 45 K DLHs), Fabrication &
Manufacturing (approximately 6 K DLHs) and Support Equipment (approximately 16
K DLHs) to Fleet Readiness Center West, Naval Air Station Lemoore, CA. Realign Naval Air Station Joint Reserve Base Fort Worth, TX, by
disestablishing the Aircraft Intermediate Maintenance Department, establishing
Fleet Readiness Center West Site Fort Worth, Naval Air Station Fort Worth, TX,
and transferring all intermediate maintenance workload and capacity to Fleet
Readiness Center West Site Fort Worth, Naval Air Station Joint Reserve Base
Fort Worth, TX.
Realign
Naval Air Station Whidbey Island, WA, by disestablishing the Aircraft Intermediate
Maintenance Department, establishing Fleet Readiness Center Northwest, Naval
Air Station Whidbey Island, WA, and transferring all intermediate maintenance
workload and capacity to Fleet Readiness Center Northwest, Naval Air Station
Whidbey Island, WA.
Realign
Naval Support Activity Crane, IN, by relocating the depot maintenance workload
and capacity for ALQ-99 Electronic Warfare to Fleet Readiness Center Northwest,
Naval Air Station Whidbey Island, WA.
Realign
Naval Air Station North Island, Naval Base Coronado, CA, as follows: disestablish Naval Air Depot North Island,
COMSEACONWINGPAC (AIMD), and NADEP North Island Detachment North Island;
establish Fleet Readiness Center Southwest, Naval Air Station North Island,
Naval Base Coronado, CA; relocate depot maintenance workload and capacity for Aircraft
Avionics/Electronics Components (approximately 6 K DLHs), Aircraft Hydraulic
Components (approximately 2 K DLHs), Aircraft Landing Gear Components
(approximately 3 K DLHs), Aircraft Other Components (approximately 13 K DLHs),
and Aircraft Structural Components (approximately 4 K DLHs) from Naval Air
Depot North Island to Fleet Readiness Center Southwest Site Point Mugu, hereby
established at Naval Air Station Point Mugu, Naval Base Ventura, CA; relocate depot maintenance workload and capacity for Aircraft
Avionics/Electronics Components (approximately 26 K DLHs), Aircraft Hydraulic
Component (approximately 8 K DLHs), Aircraft Landing Gear Components
(approximately 13 K DLHs), Aircraft Other Components (approximately 55 K DLHs),
Aircraft Structural Components (approximately 16 K DLHs) from Naval Air Depot
North Island to Fleet Readiness Center Southwest Site Miramar, hereby established
at Marine Corps Air Station Miramar, CA; relocate depot maintenance workload and capacity for Aircraft
Avionics/Electronics Components (approximately 8 K DLHs), Aircraft Hydraulic
Components (approximately 2 K DLHs), Aircraft Landing Gear Components
(approximately 4 K DLHs), Aircraft Other Components (approximately 17 K DLHs),
and Aircraft Structural Components (approximately 5 K DLHs) from Naval Air
Depot North Island to Fleet Readiness Center Southwest Site Pendleton, hereby
established at Marine Corps Air Station Camp Pendleton, CA; relocate depot maintenance workload and capacity for Aircraft
Avionics/Electronics Components (approximately 6 K DLHs), Aircraft Hydraulic
Components (approximately 2 K DLHs), Aircraft Landing Gear Components
(approximately 3 K DLHs), Aircraft Other Components (approximately 12 K DLHs),
Aircraft Structural Components (approximately 3 K DLHs) from Naval Air Depot
North Island to Fleet Readiness Southwest Site Yuma, hereby established at
Marine Corps Air Station Yuma, AZ; relocate depot maintenance workload and
capacity for Aircraft Avionics/Electronics Components (approximately 6 K DLHs),
Aircraft Hydraulic Components ( approximately 2 K DLHs), Aircraft Landing Gear
Components (approximately 3 K DLHs), Aircraft Other Components (approximately
12 K DLHs), and Aircraft Structural Components (approximately 3 K DLHs) from
Naval Air Depot North Island to Fleet Readiness Center West Site Fort Worth,
Fort Worth TX; relocate depot maintenance workload and capacity for Aircraft
Avionics/Electronics Components (approximately 25 K DLHs), Aircraft Hydraulic
Components (approximately 8 K DLHs), Aircraft Landing Gear Components
(approximately 13 K DLHs), Aircraft Other Components (approximately 53 K DLHs),
and Aircraft Structural Components (approximately 15 K DLHs), from Naval Air
Depot North Island to Fleet Readiness Center Northwest, Naval Air Station
Whidbey Island, WA; and transfer all remaining intermediate and depot
maintenance workload and capacity to Fleet Readiness Center Southwest, Naval
Air Station North Island, Naval Base Coronado, CA.
Realign
Naval Air Station Point Mugu, Naval Base Ventura, CA, by disestablishing the Aircraft Intermediate Maintenance
Department and transferring all intermediate maintenance workload and capacity
to Fleet Readiness Center Southwest Site Point Mugu, Naval Base Ventura, CA.
Realign Marine Corps Air Station Miramar, CA, by transferring depot maintenance workload and capacity for
Aircraft Other (approximately 28 K DLHs) and Aircraft Fighter/Attack
(approximately 39 K DLHs) and intermediate maintenance workload and capacity
for Aircraft Components, Aircraft Engines, Fabrication & Manufacturing and
Support Equipment from Marine Aviation Logistics Squadron (MALS)-11 and 16 to
Fleet Readiness Center Southwest Site Miramar, Marine Corps Air Station Miramar, CA.
Realign
Marine Corps Air Station Camp Pendleton, CA, by transferring depot maintenance workload and capacity for
Aircraft Other (approximately 22 K DLHs) and Aircraft Rotary (approximately 102
K DLHs) and intermediate maintenance workload and capacity for Aircraft
Components, Aircraft Engines, Fabrication & Manufacturing and Support
Equipment from MALS-39 to Fleet Readiness Center Southwest Site Camp Pendleton,
Marine Corps Air Station Camp Pendleton, CA.
Realign
Marine Corps Air Station Yuma, AZ, by transferring depot maintenance workload
and capacity for Aircraft Fighter/Attack, Aircraft Other and Aircraft Rotary
and intermediate maintenance workload and capacity for Aircraft Components,
Aircraft Engines, Communication/Electronics Equipment, Ordnance Weapons &
Missiles, Software and Support Equipment from MALS-13 to Fleet Readiness Center
Southwest Site Yuma, Marine Corps Air Station Yuma, AZ.
Justification:
This
recommendation realigns and merges depot and intermediate maintenance
activities. It creates 6 Fleet Readiness Centers (FRCs), with 13 affiliated FRC
Sites at satellite locations. FRC Mid-Atlantic will be located on NAS Oceana,
VA, with affiliated FRC Sites at NAS Patuxent River, MD, NAS Norfolk, VA, and
JRB New Orleans, LA. FRC East is located at Cherry Point, NC, with affiliated
FRC Sites at MCAS Beaufort, SC, and MCAS New River, NC. The existing
intermediate level activity associated with HMX-1 at MCB Quantico, VA, will
also be affiliated with FRC East. FRC Southeast will be located on NAS
Jacksonville, FL, and will have an affiliated FRC Site at NAS Mayport, FL. FRC
West will be located on NAS Lemoore, CA, and will have FRC affiliated sites at NAS JRB Fort Worth, TX, and
NAS Fallon, NV. FRC Southwest will be located on Naval Station Coronado, CA, and will have affiliated sites at MCAS Miramar, CA, MCAS Pendleton, CA, MCAS Yuma, AZ, and NAS Point Mugu, CA. FRC Northwest will be
located on NAS Whidbey, WA, with no affiliated FRC Sites.
This
recommendation supports both DoD and Navy transformation goals by reducing the
number of maintenance levels and streamlining the way maintenance is
accomplished with associated significant cost reductions. It supports the Naval
Aviation Enterprise’s (NAE’s) goal of transforming to fewer maintenance levels,
i.e., from 3 to 2 levels; and it supports the NAE’s strategy of positioning
maintenance activities closer to fleet concentrations when doing so will result
in enhanced effectiveness and efficiency, greater agility, and allows Naval
Aviation to achieve the right readiness at the least cost. This transformation
to FRCs produces significant reductions in the total cost of maintenance,
repair and overhaul plus the associated Supply system PHS&T (Packaging,
Handling, Storage and Transportation) as well as reparables inventory stocking
levels as a result of reduced total repair turn-around times, reduced
transportation, lower spares inventories, less manpower, and more highly
utilized infrastructure. It requires integration and collaboration between
Depot level Civil Service personnel and Military Intermediate level Sailors and
Marines. At those FRCs involving Marine Corps MALS (Marine Aviation Logistics
Squadrons), because the MALS remain deployable commands, they will affiliate
with their FRC organizations, but will remain operationally distinct and
severable in all respects. The FRC D-level functions within the MALS fall under
the Commanding Officer of each MALS. The FRC Commander is the provider of
embedded depot personnel, as well as Dlevel technical and logistics support
within the MALS. For all FRCs, there is a combined annual facility sustainment
savings of $1.1M; elimination of a total of 529,000 square feet of
depot/intermediate maintenance production space and military construction cost
avoidances of $0.2M. This recommendation also includes a military construction
cost of $85.7M.
In
addition to the actions described in this recommendation, there are four
additional actions involved in the comprehensive merger of depot and
intermediate maintenance: Naval Air Station Joint Reserve Base Willow Grove,
PA, Naval Air Station Corpus Christi, TX, Naval Air Station Brunswick, ME, and
Naval Air Station Atlanta, GA. The actions at these installations are described
in separate installation closure recommendations in the Department of the Navy
section of the BRAC Report.
Payback:
The total
estimated one time cost to the Department of Defense to implement this
recommendation is $298.1M. The net of all costs and savings to the Department
during implementation period is a savings of $1,528.2M Annual recurring savings
to the Department after implementation are $341.2M with a payback expected
immediately. The net present value of the costs and savings to the Department
over 20 years is a savings of $4,724.2M.
Economic
Impact on Communities: Assuming no economic recovery, this recommendation could result in a
maximum potential reduction of 104 jobs (53 direct jobs and 51 indirect jobs)
over the 2006-2011 period in the Bakersfield, CA Metropolitan Statistical Area,
which is less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 221 jobs (152 direct jobs and 69 indirect jobs) over the 2006-2011
period in the Martin County, IN, economic area, which is 2.6 percent of
economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 13 jobs (7 direct jobs and 6 indirect jobs) over the 2006-2011
period in the Fallon, NV Micropolitan Statistical Area, which is less than 0.1
percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 512 jobs (218 direct jobs and 294 indirect jobs) over the
2006-2011 period in the Jacksonville, FL Metropolitan Statistical Area, which
is less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 1,190 jobs (632 direct jobs and 558 indirect jobs) over the
2006-2011 period in the New Bern, NC Micropolitan Statistical Area, which is
1.8 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 12 jobs (7 direct jobs and 5 indirect jobs) over the 2006-2011
period in the Oxnard- Thousand Oaks-Ventura, CA Metropolitan Statistical Area,
which is less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 1,279 jobs (623 direct jobs and 656 indirect jobs) over the
2006-2011 period in the San Diego-Carlsbad-San Marcos, CA Metropolitan
Statistical Area, which is less than 0.1 percent of economic area employment.
Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 68 jobs (44 direct jobs and 24 indirect jobs) over the 2006-2011
period in the Virginia Beach-Norfolk-Newport News, VA Metropolitan Statistical
Area, which is less than 0.1 percent of economic area employment.
The
aggregate economic impact of all recommended actions on these economic regions
of influence was considered and is at Appendix B of Volume I.
Community
Infrastructure Assessment: A review of community attributes indicates no issues regarding the
ability of the infrastructure of the communities to support missions, forces,
and personnel. There are no known community infrastructure impediments to
implementation of all recommendations affecting the installations in this
recommendation.
Environmental
Impact: This
recommendation may impact air quality at NAS Lemoore and NAS JRB Fort Worth. A
conformity determination may be required. This recommendation has the potential
to impact cultural, archeological, or tribal resources at NAS Lemoore, NAS
Fallon, and NAS Whidbey Island, WA, if construction is required. There is a
possible impact to water resources at NAS Whidbey Island and NAS Fallon. This
recommendation has no impact on dredging; land use constraints or sensitive
resource areas; marine mammals, resources, or sanctuaries; noise; threatened
and endangered species or critical habitat; waste management; or wetlands. This
recommendation will require spending approximately $0.4M for waste management
and environmental compliance activities. This recommendation does not otherwise
impact the cost of environmental restoration, waste management, or
environmental compliance activities. The aggregate environmental impact of all
recommended BRAC actions affecting the bases in this recommendation has been
reviewed. There are no known environmental impediments to implementation of
this recommendation.
Recommendation: Realign Lackland Air Force
Base, TX, by relocating the inpatient medical function of the 59th Medical Wing (Wilford Hall
Medical Center) to the Brooke Army Medical Center, Ft Sam Houston, TX, establishing
it as the San Antonio Regional Military Medical Center, and converting Wilford
Hall Medical Center into an ambulatory care center. Realign Naval Air Station
Great Lakes, IL, Sheppard Air Force Base, TX, Naval Medical Center Portsmouth,
Naval Medical Center San Diego, CA, by relocating basic and specialty enlisted medical training to
Fort Sam Houston, TX.
Justification: The primary rationale for
this recommendation is to transform legacy medical infrastructure into a
modernized joint operational medicine platform. This recommendation reduces
excess capacity within the San Antonio Multi-Service Market (MSM: two or more
facilities colocated geographically with “shared” beneficiary population) while
maintaining the level of care for the beneficiaries, enhancing opportunities
for provider currency, and maintaining surge capacity. By making use of the
design capacity inherent in Brooke Army Medical Center (BAMC), the entire
inpatient care produced at WHMC can be relocated into this facility. In terms
of military value, while BAMC had a slightly lower quantitative military value
score than WHMC, the difference was so small as to not be a meaningful
discriminator. Additionally, the small difference is primarily attributable to
the efficiency of the Dental Clinic at WHMC, a facility that is excluded from
this recommendation. It was the military judgment of the MJCSG that in the
context of this recommendation, the condition of the facilities and their
average weighted age were the most important elements of the military value of
the two locations. In this area, BAMC received a significantly higher score
than WHMC. Additionally, it is more cost effective and timely to return BAMC to
it’s inherent design capacity and convert WHMC to an ambulatory care center,
than to do the reverse. BAMC is located in a more centralized location,
enabling it to better support the broader population area. WHMC and BAMC
support Level 1 Trauma Centers, this capability is Section 8: Recommendations –
Medical Joint Cross-Service Group Med – 11 maintained in this recommendation by
expanding the BAMC Level 1 Trauma Center to the capacity of both trauma
centers. It was therefore the military judgment of the MJCSG that
regionalization at BAMC provided the highest overall military value to the
Department. Development of a premier Regional Military Medical Center will
provide enhanced visibility, as well as, recruiting and retention advantages to
the Military Health System. The remaining civilian authorizations and
contractors at Wilford Hall Medical Center that represent unnecessary overhead
will be eliminated. Military personnel filling similar “overhead positions” are
available to be redistributed by the Service to replace civilian and contract
medical personnel elsewhere in Military Healthcare System activities of higher
military value. While the jobs are lost in the military system the same type of
job is available in the community.
This recommendation also
co-locates all (except Aerospace Medicine) medical basic and specialty enlisted
training at Fort Sam Houston, TX, with the potential of transitioning to a
joint training effort. This will result in reduced infrastructure and excess
system capacity, while capitalizing on the synergy of the co-location similar
training conducted by each of the three Services. In addition, the development
of a joint training center will result in standardized training for medical
enlisted specialties enhancing interoperability and joint deployability.
Co-location of medical enlisted training with related military clinical
activities of the San Antonio Regional Medical Center at Brooke Army Medical
Center, Fort Sam Houston, TX, provides synergistic opportunities to bring
clinical insight into the training environment, realtime. As a result, both the
healthcare delivery and training experiences are exponentially enhanced.
Payback: The total estimated one-time
cost to the Department of Defense to implement this recommendation is $1,040.9M.
The net of all costs and savings to the Department during the implementation
period is a cost of $826.7M. Annual recurring savings to the Department after
implementation are $129.0M with a payback expected in 10 years. The net present
value of the costs and savings to the Department over 20 years is a savings of
$476.2M.
Economic Impact on
Communities: Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 4,373 jobs (1,926 direct jobs and 2,447 indirect jobs) over the
2006-2011 period in the Lake County-Kenosha County, IL-WI Metropolitan
Division, which is 0.88 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
3,101 jobs (1,630 direct jobs and 1,471 indirect jobs) over the 2006-2011
period in the San Diego-Carlsbad-San Marcos, CA Metropolitan Statistical Area,
which is 0.17 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
3,963 jobs (2,378 direct jobs and 1,585 indirect jobs) over the 2006-2011
period in the Wichita Falls, TX Metropolitan Statistical Area, which is 4.26
percent of economic area employment.
Assuming no economic recovery,
this recommendation could result in a maximum potential reduction of 1,013 jobs
(489 direct jobs and 524 indirect jobs) over the 2006-2011 period in the Section 8: Recommendations –
Medical Joint Cross-Service Group Med – 12 Virginia Beach-Norfolk-Newport News, VA
Metropolitan Statistical Area, which is 0.1 percent of economic area
employment.
The aggregate economic
impact of all recommended actions on these economic regions of influence was
considered and is at Appendix B of Volume I.
Community Infrastructure
Assessment: A
review of community attributes indicates no issues regarding the ability of the
infrastructure of the communities to support missions, forces, and personnel.
Civilian inpatient capacity exists in the area to provide services to the
eligible population. There are no known community infrastructure impediments to
implementation of all recommendations affecting the installations in this
recommendation.
Environmental Impact: This recommendation is
expected to impact air quality at Fort Sam Houston. Title V permit, permit
modification, and a New Source Review may be required. This recommendation has
the potential to impact cultural or historic resources at Fort Sam Houston and
Lackland AFB. Additional operations at Fort Sam Houston may further impact
federally listed species leading to additional restrictions on training or
operations. A hazardous waste program modification may be required at Lackland
AFB. Significant mitigation measures to limit releases may be required at Fort
Sam Houston to reduce impacts to water quality and achieve US EPA water quality
standards. This recommendation has no impact on dredging; land use constraints
or sensitive resource areas; marine mammals, resources, or sanctuaries; noise;
or wetlands. This recommendation will require spending approximately $1.2M for
environmental compliance activities. This cost was included in the payback
calculation. This recommendation does not otherwise impact the costs of
environmental restoration, waste management, and environmental compliance
activities. The aggregate environmental impact of all recommended BRAC actions
affecting the bases in this recommendation has been reviewed. There are no
known environmental impediments to implementation of this recommendation.
Recommendation: Realign Detroit Arsenal, MI, by relocating the
supply contracting function for tires to the Inventory Control Point at Defense
Supply Center Columbus, OH, and disestablishing all other supply functions for
tires.
Realign Hill Air Force Base,
UT, as follows: relocate the supply contracting function for tires to the
Inventory Control Point at Defense Supply Center Columbus, OH; disestablish all
other supply functions for tires; and disestablish the storage, and
distribution functions for tires, packaged petroleum, oils, and lubricants, and
compressed gases.
Realign Naval Support
Activity, Mechanicsburg, PA, by relocating the supply contracting function for packaged
petroleum, oils, and lubricants to the Inventory Control Point at Defense
Supply Center, Richmond, VA, and disestablishing all other supply functions for
packaged petroleum, oils, and lubricants.
Realign Defense Supply
Center, Richmond, VA by disestablishing storage and distribution functions for
tires, and the supply, storage, and distribution functions for packaged
petroleum, oils, and lubricants, and compressed gases. Retain the supply
contracting function for packaged petroleum, oils, and lubricants, and
compressed gases.
Realign Defense Supply
Center Columbus, OH, Tobyhanna Army Depot, PA, Defense Distribution Depot
Susquehanna, PA, Naval Station Norfolk, VA, Marine Corps Air Station Cherry
Point, NC, Marine Corps Logistics Base, Albany, GA, Robins Air Force Base, GA,
Anniston Army Depot, AL, Naval Air Station Jacksonville, FL, Tinker Air Force
Base, OK, Corpus Christi Army Depot, TX, Naval Station Bremerton, WA, Naval
Station San Diego, CA, Defense Distribution Depot Barstow, CA, Defense Distribution Depot San Joaquin, CA, and Naval Station Pearl Harbor, HI, by disestablishing storage
and distribution functions for tires, packaged petroleum, oils, and lubricants,
and compressed gases at each location.
Justification: This recommendation achieves
economies and efficiencies that enhance the effectiveness of logistics support
to forces as they transition to more joint and expeditionary operations. This
recommendation disestablishes the wholesale supply, storage, and distribution
functions for all tires; packaged petroleum, oils and lubricants; and
compressed gases used by the Department of Defense, retaining only the supply contracting
function for each commodity. The Department will privatize these functions and
will rely on private industry for the performance of supply, storage, and
distribution of these commodities. By doing so, the Department can divest
itself of inventories and can eliminate infrastructure and personnel associated
with these functions. This recommendation results in more responsive supply
support to user organizations and thus adds to capabilities of the future
force. The recommendation provides improved support during mobilization and
deployment, and the sustainment of forces when deployed worldwide.
Privatization enables the Department to take advantage of the latest
technologies, expertise, and business practices, which translates to improved
support to customers at less cost.
It centralizes management of
tires; packaged petroleum, oils, and lubricants; and compressed gases and
eliminates unnecessary duplication of functions within the Department. Finally,
this recommendation supports transformation by privatizing the wholesale
storage and distribution processes from DoD activities.
In addition to the actions
described in this recommendation, the Department is also disestablishing
storage and distribution functions for tires, packaged petroleum, oils, and
lubricants, and compressed gases at Red River Army Depot, TX. The storage and
distribution functions at this additional location are now being disestablished
as part of a recommendation for the full closure of the Red River Army Depot
installation. The recommendation to close the installation fully supports all
objectives intended by this recommendation.
Payback: The total estimated one-time
cost to the Department of Defense to implement this recommendation is $6.4M.
The net of all costs and savings to the Department during the implementation
period is a savings of $333.6M. Annual recurring savings to the Department
after implementation are $43.7M with a payback expected immediately. The net
present value of the costs and savings to the Department over 20 years is a
savings of $735.3M.
Community Infrastructure
Assessment: A
review of community attributes indicates no issues regarding the ability of the
infrastructure of the communities to support missions, forces, and personnel.
There are no known community infrastructure impediments to implementation of
all recommendations affecting the installations in this recommendation.
Environmental Impact: This recommendation has no
impact on air quality; cultural, archeological, or tribal resources; dredging;
land use constraints or sensitive resource areas; marine mammals, resources, or
sanctuaries; noise; threatened and endangered species or critical habitat;
waste management; water resources; or wetlands. This recommendation will
require spending approximately $0.2M for waste management and environmental
compliance activities. This cost was included in the payback calculation. This
recommendation does not otherwise impact the costs of environmental
restoration, waste management, and environmental compliance activities. The
aggregate environmental impact of all recommended BRAC actions affecting the
bases in this recommendation has been reviewed. There are no known
environmental impediments to implementation of this recommendation.
Recommendation: Realign Defense Supply
Center Columbus, OH, by disestablishing the Defense Distribution Depot
Columbus, OH. Relocate the storage and distribution functions and associated
inventories to the Defense Distribution Depot Susquehanna, PA, hereby
designated the Susquehanna Strategic Distribution Platform. Realign Tobyhanna
Army Depot, PA, by consolidating the supply, storage, and distribution
functions and associated inventories of the Defense Distribution Depot
Tobyhanna, PA, with all other supply, storage, and distribution functions and
inventories that exist at Tobyhanna Army Depot to support depot operations,
maintenance, and production. Retain the minimum necessary supply, storage, and
distribution functions and inventories required to support Tobyhanna Army
Depot, and to serve as a wholesale Forward Distribution Point. Relocate all
other wholesale storage and distribution functions and associated inventories
to the Susquehanna Strategic Distribution Platform.
Realign Naval Station
Norfolk, VA, by consolidating the supply, storage, and distribution functions
and associated inventories of the Defense Distribution Depot Norfolk, VA, with
all other supply, storage, and distribution functions and inventories that
exist at Norfolk Naval Base and at Norfolk Naval Shipyard to support shipyard
operations, maintenance, and production. Retain the minimum necessary supply,
storage, and distribution functions and inventories required to support Norfolk
Naval Shipyard operations, maintenance and production, and to serve as a
wholesale Forward Distribution Point. Relocate all other wholesale storage and
distribution functions and associated inventories to the Susquehanna Strategic
Distribution Platform.
Realign Defense Supply
Center Richmond, VA, by relocating the storage and distribution functions and
associated inventories of the Defense Distribution Depot Richmond, VA, to the
Susquehanna Strategic Distribution Platform. Retain the minimum necessary
storage and distribution functions and associated inventories at Defense
Distribution Depot Richmond, VA, to serve as a wholesale Forward Distribution
Point.
Realign Marine Corps Air
Station, Cherry Point, NC by consolidating the supply, storage, and
distribution functions and associated inventories of the Defense Distribution
Depot, Cherry Point, NC, with all other supply, storage, and distribution
functions and inventories that exist at Naval Aviation Depot Cherry Point, NC,
to support depot operations, maintenance and production. Retain the minimum
necessary supply, storage, and distribution functions and inventories required
to support Naval Air Depot Cherry Point, and to serve as a wholesale Forward
Distribution Point. Relocate all other wholesale storage and distribution
functions and associated inventories to the Defense Distribution Depot Warner
Robins, GA, hereby designated the Warner Robins Strategic Distribution
Platform.
Realign Robins Air Force Base,
GA, by consolidating the supply, storage, and distribution functions and
associated inventories supporting depot operations, maintenance, and production
at the Warner Robins Air Logistics Center with the supply, storage, and
distribution functions at the Warner Robins Strategic Distribution Platform.
Realign Marine Corps
Logistics Base, Albany, GA, by consolidating the supply, storage, and
distribution functions and associated inventories of the Defense Distribution
Depot Albany, GA, with all other supply, storage, and distribution functions
and inventories that exist at the Maintenance Center Albany, GA, to support
depot operations, maintenance, and production. Retain the minimum necessary
supply, storage, and distribution functions and inventories required to support
the Maintenance Center Albany, GA, and to serve as a wholesale Forward
Distribution Point. Relocate all other wholesale storage and distribution
functions and associated inventories to the Warner Robins Strategic
Distribution Platform.
Realign Naval Air Station
Jacksonville, FL, by consolidating the supply, storage, and distribution
functions and associated inventories of the Defense Distribution Depot,
Jacksonville, FL, with all other supply, storage, and distribution functions
and inventories that exist at the Naval Aviation Depot, Jacksonville, FL, to
support depot operations, maintenance, and production. Retain the minimum
necessary supply, storage, and distribution functions and inventories required
to support the Naval Aviation Depot, Jacksonville, FL, and to serve as a
wholesale Forward Distribution Point. Relocate all other wholesale storage and
distribution functions and associated inventories to the Warner Robins
Strategic Distribution Platform.
Realign Anniston Army Depot,
AL, by consolidating the supply, storage, and distribution functions and
associated inventories of the Defense Distribution Depot Anniston, AL, with all
other supply, storage, and distribution functions and inventories that exist at
Anniston Army Depot, AL, to support depot operations, maintenance, and
production. Retain the minimum necessary supply, storage, and distribution
functions and inventories required to support Anniston Army Depot, AL, and to
serve as a wholesale Forward Distribution Point. Relocate all other wholesale
storage and distribution functions and associated inventories to the Warner
Robins Strategic Distribution Platform.
Realign Corpus Christi Army
Depot, TX, by consolidating the supply, storage, and distribution functions and
associated inventories of the Defense Distribution Depot, Corpus Christi, TX,
with all other supply, storage, and distribution functions and inventories that
exist at Corpus Christi Army Depot, TX, to support depot operations,
maintenance, and production. Retain the minimum necessary supply, storage, and
distribution functions and inventories required to support Corpus Christi Army
Depot, TX, and to serve as a wholesale Forward Distribution Point. Relocate all
other wholesale storage and distribution functions and associated inventories
to the Defense Distribution Depot Oklahoma City, hereby designated the Oklahoma
City Strategic Distribution Platform.
Realign Tinker AFB, OK, by
consolidating the supply, storage, and distribution functions and associated
inventories supporting depot operations, maintenance, and production at the Air
Logistics Center, Oklahoma City, OK, with the supply, storage, and distribution
functions and inventories at the Oklahoma City Strategic Distribution Platform.
Realign Hill AFB, UT, by
consolidating the supply, storage, and distribution functions and associated
inventories of the Defense Distribution Depot, Hill, UT, with all other supply,
storage, and distribution functions and inventories that exist at the Ogden Air
Logistics Center, UT, to support depot operations, maintenance, and production.
Retain the necessary supply, storage, and distribution functions and
inventories required to support the Ogden Air Logistics Center, UT, and to
serve as a wholesale Forward Distribution Point. Relocate all other wholesale
storage and distribution functions and associated inventories to the Defense
Distribution Depot, San Joaquin, CA, hereby designated the San
Joaquin Strategic Distribution Platform.
Realign Naval Station
Bremerton, WA, by consolidating the supply, storage, and distribution functions
and associated inventories of the Defense Distribution Depot, Puget Sound, WA,
with all other supply, storage and distribution functions and inventories that
exist at Puget Sound Naval Shipyard, WA, to support shipyard operations,
maintenance, and production. Retain the minimum necessary supply, storage, and
distribution functions and inventories required to support Puget Sound Naval
Shipyard, WA, and to serve as a wholesale Forward Distribution Point. Relocate
all other wholesale storage and distribution functions and associated
inventories to the San Joaquin Strategic Distribution Platform.
Realign Naval Station, San
Diego, CA, by consolidating the supply, storage, and distribution functions and
associated inventories of the Defense Distribution Depot, San Diego, CA, with
all other supply, storage and distribution functions and inventories that exist
at Naval Aviation Depot, North Island, CA, to support depot operations,
maintenance, and production. Retain the minimum necessary supply, storage, and
distribution functions and inventories required to support Naval Aviation
Depot, North Island, CA, and to serve as a wholesale Forward Distribution
Point. Relocate all other wholesale storage and distribution functions and
associated inventories to the San Joaquin Strategic Distribution Platform.
Realign Marine Corps
Logistics Base, Barstow, CA, by consolidating the supply, storage, and distribution functions
and associated inventories of the Defense Distribution Depot Barstow CA, with
all other supply, storage, and distribution functions and inventories that
exist at the Maintenance Center Barstow, CA, to support depot operations,
maintenance, and production. Retain the minimum necessary supply, storage, and
distribution functions and inventories at Defense Distribution Depot Barstow,
CA, that are required to support the Maintenance Center Barstow, CA, and to serve
as a wholesale Forward Distribution Point. Relocate all other wholesale storage
and distribution functions and associated inventories to the San Joaquin
Strategic Distribution Platform.
Justification: This recommendation achieves
economies and efficiencies that enhance the effectiveness of logistics support
to operational joint and expeditionary forces. It reconfigures the Department’s
wholesale storage and distribution infrastructure to improve support to the
future force, whether home-based or deployed. It transforms existing logistics
processes by creating four CONUS support regions, with each having one
Strategic Distribution Platform and multiple Forward Distribution Points. Each
Strategic Distribution Platform will be equipped with state-of-the-art consolidation,
containerization and palletization capabilities, and the entire structure will
provide for in-transit cargo visibility and real-time accountability.
Distribution Depots, no longer needed for regional supply, will be realigned as
Forward Distribution Points and will provide dedicated receiving, storing, and
issuing functions, solely in support of on-base industrial customers such as
maintenance depots, shipyards and air logistics centers. Forward Distribution
Points will consolidate all supply and storage functions supporting industrial
activities, to include those internal to depots and shipyards, and those at any
intermediate levels that may exist. This consolidation eliminates unnecessary
redundancies and duplication, and streamlines supply and storage processes.
In addition to the actions
in this recommendation, the Department is abolishing the Defense Distribution
Depot at Red River Army Depot. This action is included as part of a
recommendation to close the Red River Army Depot installation. The
recommendation to fully close the installation achieves the objective of
disestablishing the Defense Distribution Depot and is consistent with the
intent of this recommendation.
Payback: The total estimated one-time
cost to the Department of Defense to implement this recommendation is $192.7M.
The net of all costs and savings to the Department of Defense during the
implementation period is a savings of $1,047.3M. Annual recurring savings to
the Department after implementation are $203.2M with a payback expected
immediately. The net present value of the costs and savings to the Department
over 20 years is a savings of $2,925.8M.
Community Infrastructure
Assessment:
A review of community attributes indicates there are no issues regarding the
ability of infrastructure of communities to support missions, forces, and
personnel. There are no known community infrastructure impediments to
implementation of all recommendations affecting the installations in this
recommendation.
Environmental Impact: Additional operations at
Tinker may impact wetlands and may restrict operations. At Susquehanna and San
Joaquin, permits may be required for new boilers, generators, and paint
booths. Increased solid and hazardous waste may also require new permits.
Drinking water consumption will increase at these two locations and MILCON
projects require storm water permits. This recommendation has no impact on
cultural, archeological, or tribal resources; dredging; land use constraints or
sensitive resource areas; marine mammals, resources, or sanctuaries; noise; or
threatened and endangered species or critical habitat. This recommendation will
require spending approximately $0.7M for waste management and environmental
compliance activities. This cost was included in the payback calculation. This
recommendation does not otherwise impact the costs of environmental
restoration, waste management, and environmental compliance activities. The
aggregate environmental impact of all recommended BRAC actions affecting the
bases in this recommendation has been reviewed. There are no known
environmental impediments to implementation of this recommendation.
Recommendation: Realign Wright-Patterson Air
Force Base, OH, Maxwell Air Force Base, AL, and Lackland Air Force Base, TX, by
relocating Air & Space Information Systems Research and Development &
Acquisition to Hanscom Air Force Base, MA. Realign Eglin Air Force Base, FL, by
relocating Air & Space Sensors, Electronic Warfare & Electronics and
Information Systems Test & Evaluation to Edwards Air Force Base, CA.
Justification: This recommendation will
reduce the number of technical facilities engaged in Air & Space Sensors,
Electronic Warfare, and Electronics and Information Systems RDAT&E from 6
to 2. Through this consolidation, the Department will increase efficiency of
RDAT&E operations resulting, in a multi-functional center of excellence in
the rapidly changing technology area of C4ISR.
Payback: The total estimated one-time
cost to the Department of Defense to implement this recommendation is $254.4M. The
net of all costs and savings to the Department during the implementation period
is a cost of $115.3M. Annual recurring savings to the Department after
implementation are $36.2M with a payback expected in 8 years. The net present
value of the costs and savings to the Department over 20 years is a savings of
$238.0M.
Economic Impact on
Communities: Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 2,250 jobs (1,262 direct jobs and 988 indirect jobs) over the
2006-2011 period in the Dayton, OH, Metropolitan Statistical Area, which is
0.44 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
384 jobs (220 direct jobs and 164 indirect jobs) over the 2006-2011 period in
the Fort Walton Beach-Crestview-Destin, FL, Metropolitan Statistical Area,
which is 0.32 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
3,254 jobs (1,971 direct jobs and 1,283 indirect jobs) over the 2006-2011
period in the Montgomery, AL, Metropolitan Statistical Area, which is 1.6
percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
212 jobs (110 direct jobs and 102 indirect jobs) over the 2006-2011 period in
the San Antonio, TX, Metropolitan Statistical Area, which is less than 0.1
percent of economic area employment.
The aggregate economic
impact of all recommended actions on these economic regions of influence was
considered and is at Appendix B of Volume I.
Community Infrastructure
Assessment: A
review of community attributes indicates no issues regarding the ability of the
infrastructure of the communities to support missions, forces, and personnel.
There are no known community infrastructure impediments to implementation of
all recommendations affecting the installations in this recommendation.
Environmental Impact: This recommendation has the
potential to impact air quality at Hanscom and Edwards. Additional operations at Hanscom and Edwards may impact archeological
sites, which may constrain operations. This recommendation may require building
on constrained acreage at Hanscom. Additional operations on Edwards may impact
threatened and endangered species and/or critical habitats. The hazardous waste
program at Hanscom will need modification. Additional operations may impact
wetlands at Hanscom, which may restrict operations. This recommendation has no
impact on dredging; marine mammals, resources, or sanctuaries; noise; waste
management; or water resources. This recommendation will require spending
approximately $0.5M cost for waste management and environmental compliance
activities. This cost was included in the payback calculation. This
recommendation does not otherwise impact the costs of environmental
restoration, waste management, and environmental compliance activities. The
aggregate environmental impact of all recommended BRAC actions affecting the
bases in this recommendation has been reviewed. There are no known
environmental impediments to implementation of this recommendation.
Recommendation: Realign Washington Navy
Yard, DC, by disestablishing the Space Warfare Systems Center Charleston, SC,
detachment Washington Navy Yard and assign functions to the new Space Warfare
Systems Command Atlantic Naval Amphibious Base, Little Creek, VA.
Realign Naval Station,
Norfolk, VA, by disestablishing the Space Warfare Systems Center Norfolk, VA,
and the Space Warfare Systems Center Charleston, SC, detachment Norfolk, VA,
and assign functions to the new Space Warfare Systems Command Atlantic Naval
Amphibious Base, Little Creek, VA.
Realign Naval Weapons
Station Charleston, SC, as follows: relocate Surface Maritime Sensors,
Electronic Warfare, and Electronics Research, Development & Acquisition,
and Test & Evaluation of the Space Warfare Center to Naval Surface Warfare
Center Division, Dahlgren, VA; relocate Subsurface Maritime Sensors, Electronic
Warfare, and Electronics Research, Development & Acquisition, and Test
& Evaluation of the Space Warfare Center to Naval Station Newport, RI; and
relocate the Command Structure of the Space Warfare Center to Naval Amphibious
Base, Little Creek, VA, and consolidate it with billets from Space Warfare
Systems Command San Diego to create the Space Warfare Systems Command Atlantic,
Naval Amphibious Base, Little Creek, VA. The remaining Maritime Information
Systems Research, Development & Acquisition, and Test & Evaluation
functions at Naval Weapons Station Charleston, SC, are assigned to Space
Warfare Systems Command Atlantic, Naval Amphibious Base, Little Creek, VA.
Realign Naval Base Ventura County, CA, Naval Surface
Warfare Center Division, Dahlgren, VA, and Naval Station Newport, RI, by
relocating Maritime Information Systems Research, Development &
Acquisition, and Test & Evaluation to Naval Submarine Base Point Loma, San Diego, CA, and consolidating with the Space Warfare Center to
create the new Space Warfare Systems Command Pacific, Naval Submarine Base
Point Loma, San Diego, CA.
Realign Naval Submarine Base
Point Loma, San Diego, CA, as follows: relocate Surface Maritime Sensors,
Electronic Warfare, and Electronics Research, Development & Acquisition, and
Test & Evaluation of the Space Warfare Center to Naval Surface Warfare
Center Division, Dahlgren, VA; relocate Subsurface Maritime Sensors, Electronic
Warfare, and Electronics Research, Development & Acquisition, and Test
& Evaluation of the Space Warfare Center to Naval Station Newport, RI;
disestablish Space Warfare Systems Center Norfolk, VA, detachment San Diego,
CA, and assign functions to the new Space Warfare Systems Command Pacific,
Naval Submarine Base Point Loma, San Diego, CA; disestablish Naval Center for Tactical Systems
Interoperability, San Diego, CA, and assign functions to the new Space Warfare
Systems Command Pacific, Naval Submarine Base Point Loma, San Diego, CA; and disestablish Space Warfare Systems Command San
Diego, CA, detachment Norfolk, VA, and assign functions to the new Space
Warfare Systems Command Atlantic, Naval Amphibious Base, Little Creek , VA.
Realign Naval Air Station
Patuxent River, MD, by relocating Subsurface Maritime Sensors, Electronic
Warfare, and Electronics Research, Development & Acquisition, and Test
& Evaluation of the Naval Air Warfare Center, Aircraft Division to Naval
Station Newport, RI. Realign Naval Air Station Jacksonville, FL, by disestablishing
the Space Warfare Systems Center Charleston, SC, detachment Jacksonville, FL.
Realign Naval Air Station
Pensacola, FL, by relocating the Space Warfare Systems Center Charleston, SC,
detachment Pensacola, FL, to Naval Weapons Station Charleston, SC. Realign
Naval Weapons Station Yorktown, VA, by relocating the Space Warfare Systems
Center Charleston, SC, detachment Yorktown, VA, to Naval Station Norfolk, VA,
and consolidating it into the new Space Warfare Systems Command Atlantic
detachment, Naval Station Norfolk, VA.
Justification: These recommended
realignments and consolidations provide for multifunctional and
multidisciplinary Centers of Excellence in Maritime C4ISR. This recommendation
will also reduce the number of technical facilities engaged in Maritime
Sensors, Electronic Warfare, & Electronics and Information Systems
RDAT&E from twelve to five. This, in turn, will reduce overlapping
infrastructure increase the efficiency of operations and support an integrated
approach to RDAT&E for maritime C4ISR. Another result would also be reduced
cycle time for fielding systems to the warfighter.
Payback: The total estimated one-time
cost to the Department of Defense to implement this recommendation is $106.1M.
The net of all costs and savings to the Department during the implementation
period is a savings of $88.6M. Annual recurring savings to the Department after
implementation are $38.7M with a payback expected in 1 year. The net present
value of the costs and savings to the Department over 20 years is a savings of
$455.1M.
Economic Impact on
Communities: Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 74 jobs (28 direct jobs and 46 indirect jobs) over the 2006-2011
period in Charleston-North Charleston, SC, Metropolitan Statistical Area, which
is less than 0.1 percent of economic area employment. Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
81 jobs (34 direct jobs and 47 indirect jobs) over the 2006-2011 period in
Jacksonville, FL, Metropolitan Statistical Area, which is less than 0.1 percent
of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
78 jobs (34 direct jobs and 44 indirect jobs) over the 2006-2011 period in the
Lexington Park, MD, Micropolitan Statistical Area, which is 0.2 percent of
economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
286 jobs (127 direct jobs and 159 indirect jobs) over the 2006-2011 period in
the Oxnard-Thousand Oaks-Ventura, CA, Metropolitan Statistical Area, which is
less than 0.1 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
278 jobs (102 direct jobs and 176 indirect jobs) over the 2006-2011 period in
the Pensacola-Ferry Pass-Brent, FL, Metropolitan Statistical Area, which is 0.1
percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
4 jobs (2 direct jobs and 2 indirect jobs) over the 2006-2011 period in
Providence- New Bedford-Fall River, RI-MA, Metropolitan Statistical Area, which
is less than 0.1 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
88 jobs (44 direct jobs and 44 indirect jobs) over the 2006-2011 period in the
San Diego-Carlsbad-San Marcos, CA, Metropolitan Statistical Area, which is less
than 0.1 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
211 jobs (87 direct jobs and 124 indirect jobs) over the 2006-2011 period in
the Virginia Beach-Norfolk-Newport News, VA-NC, Metropolitan Statistical Area,
which is less than 0.1 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
302 jobs (172 direct jobs and 130 indirect jobs) over the 2006-2011 period in
the Washington-Arlington-Alexandria, DC-VA-MD-WV, Metropolitan Division, which
is less than 0.1 percent of economic area employment.
The aggregate economic
impact of all recommended actions on these economic regions of influence was
considered and is at Appendix B of Volume I.
Community Infrastructure
Assessment: A
review of community attributes indicates no issues regarding the ability of the
infrastructure of the communities to support missions, forces, and personnel.
There are no known community infrastructure impediments to implementation of
all recommendations affecting the installations in this recommendation.
Environmental Impact: Naval Undersea Warfare
Center, Newport is in serious non-attainment for Ozone (1hr) and proposed to be
in serious non-attainment for Ozone (8hr). San Diego is in attainment for all
criteria pollutants. Naval Surface Warfare Center, Dahlgren, VA, is in
attainment for all criteria pollutants with the exception of 8 hour and 1 hour
O3 and Pb, which are Unclassifiable. Naval Amphibious Base Little Creek, VA,
Naval Station Norfolk, VA, and Naval Weapons Station Charleston, SC, are in
attainment for all Criteria Pollutants. It is in a proposed non-attainment for
Ozone (1 hour). Archeological and historical sites have been identified on
Dahlgren that may impact current construction or current operations. Norfolk
has potential archeological restrictions to future construction. Threatened and
endangered species are present at Newport and have delayed or diverted testing.
There is a potential impact regarding the bald eagle at Dahlgren. This
recommendation has the potential to impact the hazardous waste and solid waste
program at Dahlgren. Newport, Dahlgren, Little Creek, Charleston, Norfolk, and
San Diego all discharge to impaired waterways, and groundwater and surface
water contamination are reported. This recommendation has no impact on
dredging; land use constraints or sensitive resource areas; marine mammals,
resources, or sanctuaries; noise; waste management; water resources; or
wetlands. This recommendation will require spending approximately $0.1M for
waste management and environmental compliance activities. This cost was
included in the payback calculation. This recommendation does not otherwise
impact the costs of environmental restoration, waste management, and
environmental compliance activities. The aggregate environmental impact of all
recommended BRAC actions affecting the bases in this recommendation has been
reviewed. There are no known environmental impediments to implementation of
this recommendation.
Create a Naval Integrated Weapons & Armaments Research, Development & Acquisition, Test & Evaluation Center
Recommendation: Realign Naval Surface
Warfare Center Crane, IN, by relocating all Weapons and Armaments Research,
Development & Acquisition, and Test & Evaluation, except gun/ammo,
combat system security, and energetic materials to Naval Air Weapons Station
China Lake, CA.
Realign Naval Surface
Warfare Center Indian Head, MD, by relocating all Weapons and Armaments
Research, Development & Acquisition, and Test & Evaluation, except
gun/ammo, underwater weapons, and energetic materials, to Naval Air Weapons
Station China Lake, CA.
Realign Naval Air Station
Patuxent River, MD, by relocating all Weapons and Armaments Research,
Development & Acquisition, and Test & Evaluation, except the Program
Executive Office and Program Management Offices in Naval Air Systems Command,
to Naval Air Weapons Station China Lake, CA.
Realign Naval Base Ventura County, Point Mugu, CA, by
relocating all Weapons and Armaments Research, Development & Acquisition,
and Test & Evaluation to Naval Air Weapons Station China Lake, CA.
Realign Naval Weapons
Station Seal Beach, CA, by relocating all Weapons and Armaments Research, Development
& Acquisition, and Test & Evaluation, except underwater weapons and
energetic materials, to Naval Air Weapons Station China Lake, CA.
Realign Naval Surface
Warfare Center, Yorktown, VA, by relocating all Weapons and Armaments Research,
Development & Acquisition, and Test & Evaluation to Naval Surface
Warfare Center Indian Head, MD.
Realign Naval Base Ventura County, Port Hueneme, CA, by
relocating all Weapons and Armaments Research, Development & Acquisition,
and Test & Evaluation, except weapon system integration, to Naval Air
Weapons Station China Lake, CA.
Realign Fleet Combat
Training Center, CA (Port Hueneme Detachment, San Diego, CA), by relocating all
Weapons and Armaments weapon system integration Research, Development &
Acquisition, and Test & Evaluation to Naval Surface Warfare Center
Dahlgren, VA.
Realign Naval Surface
Warfare Center Dahlgren, VA, by relocating all Weapons & Armaments
Research, Development & Acquisition, and Test & Evaluation, except
guns/ammo and weapon systems integration to Naval Air Weapons Station China
Lake, CA.
Justification: This recommendation realigns
and consolidates those facilities working in Weapons & Armaments (W&A)
Research, Development & Acquisition, and Test and Evaluation (RDAT&E)
into a Naval Integrated RDAT&E center at the Naval Air Warfare Center,
China Lake, CA. Additional synergistic realignments for W&A was achieved at
two receiver sites for specific focus. The Naval Surface Warfare Center,
Dahlgren, VA, is a receiver specialty site for Naval surface weapons systems
integration and receives a west coast site for consolidation. This construct
creates an integrated W&A RDAT&E center in China Lake, CA, energetics center at Indian Head, MD, and consolidates Navy
surface weapons system integration at Dahlgren, VA. All actions relocate
technical facilities with lower overall quantitative Military Value (across
Research, Development & Acquisition and Test & Evaluation) into the Integrated
RDAT&E center and other receiver sites with greater quantitative Military
Value. Consolidating the Navy’s air-to-air, air-to-ground, and surface launched
missile RD&A, and T&E activities at China Lake, CA, would create an efficient integrated RDAT&E center. China
Lake is able to accommodate with
minor modification/addition both mission and lifecycle/ sustainment functions
to create synergies between these traditionally independent communities.
During the other large scale
movements of W&A capabilities noted above, Weapon System Integration was
specifically addressed to preserve the synergies between large highly
integrated control system developments (Weapon Systems Integration) and the
weapon system developments themselves. A specialty site for Naval Surface
Warfare was identified at Dahlgren, VA, that was unique to the services and a
centroid for Navy surface ship developments. A satellite unit from the Naval
Surface Warfare Center, Port Hueneme, San Diego Detachment will be relocated to
Dahlgren.
The Integrated RDAT&E
Center at China Lake provides a diverse set of
open-air range and test environments (desert, mountain, forest) for W&A
RDAT&E functions. Synergy will be realized in air-to-air, air-to-ground,
and surface launched mission areas. This recommendation enables technical
synergy, and positions the Department of Defense to exploit center-of-mass
scientific, technical and acquisition expertise with weapons and armament
Research, Development & Acquisition that currently resides at 10 locations
into the one Integrated RDAT&E site, one specialty site, and an energetics
site.
Payback: The total estimated one-time
cost to the Department of Defense to implement this recommendation is $358.1M.
The net of all costs and savings to the Department during the implementation
period is a cost of $148.7M. Annual recurring savings to the Department after
implementation are $59.7M with a payback expected in 7 years. The net present
value of the costs and savings to the Department over 20 years is a savings of
$433.4M.
Economic Impact on
Communities: Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 375 jobs (258 direct jobs and 117 indirect jobs) over the
2006-2011 period in the Martin County, IN, economic area, which is 4.4 percent
of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
543 jobs (258 direct jobs and 285 indirect jobs) over the 2006-2011 period in
the Lexington Park, MD, Micropolitan Statistical Area, which is 1.0 percent of
economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
5,012 jobs (2,250 direct jobs and 2,762 indirect jobs) over the 2006-2011
period in the Oxnard-Thousand Oaks-Ventura, CA, Metropolitan Statistical Area,
which is 1.2 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
97 jobs (47 direct jobs and 50 indirect jobs) over the 2006-2011 period in the
San Diego-Carlsbad-San Marcos, CA, Metropolitan Statistical Area, which is less
than 0.1 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
76 jobs (45 direct jobs and 31 indirect jobs) over the 2006-2011 period in the
Santa Ana-Anaheim-Irvine, CA, Metropolitan Division, which is less than 0.1
percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
142 jobs (61 direct jobs and 81 indirect jobs) over the 2006-2011 period in the
Virginia Beach-Norfolk-Newport News, VA-NC, Metropolitan Statistical Area,
which is less than 0.1 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
91 jobs (52 direct jobs and 39 indirect jobs) over the 2006-2011 period in the
Washington-Arlington-Alexandria, DC-VA-MD-WV, Metropolitan Division, which is
less than 0.1 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
333 jobs (155 direct jobs and 178 indirect jobs) over the 2006-2011 period in
the King George County, VA, economic area, which is 2.4 percent of economic
area employment.
The aggregate economic impact
of all recommended actions on these economic regions of influence was
considered and is at Appendix B of Volume I.
Community Infrastructure
Assessment: A
review of community attributes indicates no issues regarding the ability of the
infrastructure of the communities to support missions, forces, and personnel.
There are no known community infrastructure impediments to implementation of
all recommendations affecting the installations in this recommendation.
Environmental Impact: This recommendation has the
potential to impact air quality at Indian Head and China Lake. Archeological and historical sites exist on NSWC Dahlgren, which may
impact current construction and operations. This recommendation has the
potential to impact land use constraints or sensitive resource areas at Indian
Head and China Lake. This recommendation has no impact on dredging; marine mammals,
resources, or sanctuaries; noise; threatened and endangered species or critical
habitat; waste management; water resources; or wetlands. This recommendation
will require spending approximately $0.2M for waste management activities and
$1.1M for environmental compliance activities. These costs were included in the
payback calculation. This recommendation does not otherwise impact the costs of
environmental restoration, waste management, and environmental compliance
activities. The aggregate environmental impact of all recommended BRAC actions
affecting the bases in this recommendation has been reviewed. There are no
known environmental impediments to implementation of this recommendation.
Recommendation: Realign the Adelphi Laboratory
Center, MD, by relocating gun and ammunition Research and Development &
Acquisition to Picatinny Arsenal, NJ.
Realign Naval Surface
Warfare Center Division Crane, IN, by relocating gun and ammunition Research
and Development & Acquisition to Picatinny Arsenal, NJ.
Realign the Fallbrook, CA, detachment of Naval Surface Warfare Center Division Crane, IN, by
relocating gun and ammunition Research and Development & Acquisition to
Picatinny Arsenal, NJ.
Realign Naval Surface
Warfare Center Division Dahlgren, VA, by relocating gun and ammunition Research
and Development & Acquisition to Picatinny Arsenal, NJ.
Realign the Louisville, KY,
detachment of Naval Surface Warfare Center Division Port Hueneme, CA, by relocating
gun and ammunition Research and Development & Acquisition to Picatinny
Arsenal, NJ.
Realign Naval Air Warfare
Center Weapons Division China Lake, CA, by relocating gun and ammunition Research and Development &
Acquisition to Picatinny Arsenal, NJ.
Realign Naval Surface
Warfare Center Division Indian Head, MD, by relocating gun and ammunition
Research and Development & Acquisition to Picatinny Arsenal, NJ.
Realign Naval Surface
Warfare Center Division Earle, NJ, by relocating weapon and armament packaging
Research and Development & Acquisition to Picatinny Arsenal, NJ.
Justification: This recommendation realigns
and consolidates those gun and ammunition facilities working in Weapons and
Armaments (W&A) Research (R), Development & Acquisition (D&A). This
realignment would result in a more robust joint center for gun and ammunition
Research, Development & Acquisition at Picatinny Arsenal, NJ. This location
is already the greatest concentration of military value in gun and ammunition
W&A RD&A.
Picatinny Arsenal is the
center-of-mass for DoD’s Research, Development & Acquisition of guns and
ammunition, with a workload more than an order of magnitude greater than any
other DoD facility in this area. It also is home to the DoD’s Single Manager
for Conventional Ammunition. Movement of all the Services’ guns and ammunition
work to Picatinny Arsenal will create a joint center of excellence and provide
synergy in armament development for the near future and beyond, featuring a
Joint Packaging, Handling, Shipping and Transportation (PHS&T) Center,
particularly important in this current time of high demand for guns and
ammunition by all the services. Technical facilities with lower quantitative
military value are relocated to Picatinny Arsenal.
This recommendation includes
Research, Development & Acquisition activities in the Army and Navy. It
promotes jointness, enables technical synergy, and positions the Department of Defense
to exploit center-of-mass scientific, technical, and acquisition expertise
within the weapons and armament Research, Development & Acquisition
community that currently resides at this DoD specialty location.
Payback: The total estimated one-time
cost to the Department of Defense to implement this recommendation is $116.3M.
The net of all costs and savings to the Department during the implementation
period is cost of $81.2M. Annual recurring savings to the Department after
implementation are $11.3M with a payback expected in 13 years. The net present
value of the costs and savings to the Department over 20 years is a savings of
$32.6M.
Economic Impact on
Communities: Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 11 jobs (5 direct jobs and 6 indirect jobs) over the 2006-2011
period in Bakersfield, CA, Metropolitan Statistical Area which is less than 0.1
percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
83 jobs (43 direct jobs and 40 indirect jobs) over the 2006-2011 period in the
Bethesda-Frederick-Gaithersburg, MD, Metropolitan Division, which is less than
0.1 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
421 jobs (289 direct jobs and 132 indirect jobs) over the 2006-2011 period in
Martin County, IN, economic area, which is 4.9 percent of economic area
employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
126 jobs (67 direct jobs and 59 indirect jobs) over the 2006-2011 periods in
the Edison, NJ, Metropolitan Division, which is less than 0.1 percent of
economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
506 jobs (296 direct jobs and 210 indirect jobs) over the 2006-2011 periods in
the Louisville, KY-IN, Metropolitan Statistical Area, which is less than 0.1
percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
302 jobs (146 direct jobs and 156 indirect jobs) over the 2006-2011 periods in
the San Diego-Carlsbad-San Marcos, CA, Metropolitan Statistical Area, which is
less than 0.1 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
76 jobs (43 direct jobs and 33 indirect jobs) over the 2006-2011 periods in the
Washington-Arlington-Alexandria, DC-VA-MD-WV, Metropolitan Division, which is
less than 0.1 percent of economic area employment.
Assuming no economic
recovery, this recommendation could result in a maximum potential reduction of
202 jobs (93 direct jobs and 109 indirect jobs) over the 2006-2011 periods in
the King George County, VA, economic area, which is 1.4 percent of economic
area employment.
The aggregate economic
impact of all recommended actions on these economic regions of influence was
considered and is at Appendix B of Volume I.
Community Infrastructure
Assessment: A
review of community attributes indicates no issues regarding the ability of the
infrastructure of the communities to support missions, forces, and personnel.
There are no known community infrastructure impediments to implementation of
all recommendations affecting the installations in this recommendation.
Environmental Impact: This recommendation is
expected to impact air quality at Picatinny, which is in severe non-attainment
for Ozone. This recommendation may have a minimal effect on cultural resources
at Picatinny. Additional operations may further impact threatened/endangered
species at Picatinny, leading to additional restrictions on training or operations.
This recommendation has no impact on dredging; land use constraints or
sensitive resource areas; marine mammals, resources, or sanctuaries; noise;
waste management; or wetlands. This recommendation will require spending
approximately $0.3M for environmental compliance activities. This cost was
included in the payback calculation. This recommendation does not otherwise
impact the costs of environmental restoration, waste management, and
environmental compliance activities. The aggregate environmental impact of all
recommended BRAC actions affecting the bases in this recommendation has been
reviewed. There are no known environmental impediments to implementation of
this recommendation.
Navy Sensors, Electronic Warfare, and Electronics Research, Development & Acquisition, Test & Evaluation
Recommendation: Realign Naval Air Warfare
Center, Weapons Division, Point Mugu, CA. Relocate the Sensors, Electronic
Warfare (EW), and Electronics Research, Development, Acquisition, Test &
Evaluation (RDAT&E) functions to Naval Air Warfare Center, Weapons
Division, China Lake, CA.
Justification: Consolidating the Sensors,
EW, and Electronics RDAT&E functions at China Lake will eliminate redundant
infrastructure between Point Mugu and China Lake and provide for the more
efficient use of the remaining assets including the Electronic Combat Range and
other integration laboratories at China Lake.
Payback: The total estimated one-time
cost to implement this recommendation is $72.7M. The net of all costs and
savings to the Department of Defense during the implementation period is a cost
of $50.9M. Annual recurring savings to the Department after implementation are
$6.7M with a payback expected in 12 years. The net present value of the costs
and savings to the Department over 20 years is a savings to the Department of
$16.9M.
Economic Impact on
Communities: Assuming
no economic recovery, this recommendation could result in a maximum potential
reduction of 1,075 jobs (479 direct jobs and 596 indirect jobs) over the
2006-2011 period in the Oxnard-Thousand Oaks-Ventura, CA, Metropolitan
Statistical Area economic area, which is 0.3 percent of economic area
employment. The aggregate economic impact of all recommended actions on this
economic region of influence was considered and is at Appendix B of Volume I.
Community Infrastructure
Assessment: A
review of community attributes indicates no issues regarding the ability of the
infrastructure of the communities to support missions, forces, and personnel.
There are no known community infrastructure impediments to implementation of
all recommendations affecting the installations in this recommendation.
Environmental Impact: An air conformity determination will be needed.
Industrial waste management permits may need to be amended and additional water
resources may be necessary at China Lake to accommodate new mission.
This recommendation has no impact on cultural, archeological, or tribal
resources; dredging; land use constraints or sensitive resource areas; marine
mammals, resources, or sanctuaries; noise; threatened and endangered species or
critical habitat; waste management; or wetlands. This recommendation will
require spending approximately less than $0.04M for waste management and
environmental compliance activities. These costs were included in the payback
calculation. This recommendation does not otherwise impact the costs of
environmental restoration, waste management, or environmental compliance
activities. The aggregate environmental impact of all recommended BRAC actions
affecting the bases in this recommendation has been reviewed. There are no
known environmental impediments to implementation of this recommendation.
SOURCE: California Institute for Federal Policy
Research – http://www.calinst.org